How to Make a Responsibility Assignment Matrix for a Project (Template Included)

ProjectManager

The most important resource you’ll employ to deliver the project is people. They have to fit into the schedule and maintain the project budget. Defining what their roles and responsibilities are when executing tasks and delivering on the project goals is an important part of controlling the project.

How can you coordinate all the people who are involved in a project so they know what they’re doing and don’t block others from doing what they are assigned? Using a responsibility assignment matrix can help. An assignment matrix gives your project a team that gets things done.

What is a Responsibility Assignment Matrix in Project Management?

A responsibility assignment matrix (RAM) is a project management chart used to identify and define the various people and organizations and outline each of their roles in working on tasks or delivering a part of the project.

Project managers use an assignment matrix to clarify what cross-functional teams do within the boundaries of the project and its numerous processes. Sometimes a responsibility assignment matrix is required when responding to a request for proposal (RFP).

The responsibility assignment matrix can also be called a RACI matrix, which stands for responsible, accountable, consulted and informed.

  • Responsible: Notes who is responsible for executing the task, which is then assigned to them.
  • Accountable: Notes who has decision-making authority and how that power is delegated throughout the project team.
  • Consulted: Notes who is able to offer insight into the task, from team members to stakeholders.
  • Informed: Notes who is updated on what in terms of progress and performance, as well as when and how this information is disseminated.

This creates a map of connections between activities and project team members. Depending on the size of the project, there can be several assignment matrices used for various project levels.

Why Create a Responsibility Assignment Matrix?

The assignment matrix identifies what everyone on the team is responsible for, which means not only what their duties are, but how they participate in the project. Some will have defined tasks, others will offer help with work, while there are some who are designated as decision-makers. These groups all have an identity and function within the project to help guide it towards a successful end.

Clear communication leads to more efficient projects. An assignment matrix facilitates better communication between team members and provides transparency by creating a system to make sure everyone is updated and always on the same page. Belaboring communications can bog down a project with too many pointless meetings and confusing interactions in which people try to understand what they’re supposed to be doing. Using the responsibility assignment matrix helps, but having project management software that connects teams in real-time is ideal.

ProjectManager manages project information by allowing teams to attach files directly to tasks, and our unlimited file storage keeps important project documents at your fingertips anywhere, anytime. Commenting on tasks can save time and tagging others in the project team creates a communication process that avoids the pitfalls of redundancies or unnecessary meetings.

Gantt chart screenshot with a team collaboration pop up

When Should a Responsibility Assignment Matrix Be Created?

The responsibility assignment matrix would be created at the start of the project. You’d want to have everyone on the project team aware of where they stand in terms of their involvement before they start executing tasks.

As much as its use is a preventative measure, it can be used prescriptively. If you’re deep into the project and things are not moving as planned, there could be communication gridlock. If team members are not in the loop, or misconstrue what they’re supposed to be doing, using a responsibility assignment matrix might untie up those knots in the communication channel.

If there’s a problem with leadership overruling suggestions on how to advance the project and this is seen as a problem, it’s likely that the roles and responsibilities of the project team need refining. The responsibility assignment matrix defines who has authority to make decisions and using it or revisiting can determine if the right people are in that position.

In fact, any of the definitions might need reexamining at any phase in the project. Perhaps tasks are falling behind schedule. This could be because team members aren’t aware of what tasks they own. Anytime a delay occurs, returning to the assignment matrix is a good first step, even if you went through the process as you should during the planning stage of the project.

How to Create a Responsibility Assignment Matrix

The actual making of a responsibility assignment matrix is not as difficult as getting everyone on board with what their roles and responsibilities are.

Therefore, you want to include your team in the process, get their input and eventually buy-in without spending too much time and energy on the process. Follow these steps to make sure everyone is in agreement and you’ll have a successful responsibility assignment.

  • Identify all the participants involved in the project, from team members to stakeholders and everyone in between.
  • List all deliverables associated with the project. Use a work breakdown structure to make sure you don’t miss any.
  • Meet with team members on how to execute the tasks to create the deliverables. Every task needs to be discussed in terms of the team’s responsibility and authority.
  • Draft the responsibility assignment matrix using a table with the project tasks listed on the left-hand column. Across the top add the name of everyone in the project.
  • Where the tasks meet the project team member, assign whether they’re responsible, accountable, consulted or informed.
  • When completed, share the responsibility assignment matrix with the project team and stakeholders and hold a meeting if necessary to make sure everyone understands their part in the project. If you’re working in a shared space, print out a copy and post it.

Free Responsibility Assignment Matrix Template

Using a RACI template is a shortcut that sets up your team and the project for success. ProjectManager is more than an award-winning software that organizes tasks, teams and projects to streamline work and boost productivity, it’s also the online hub for all things project management.

Among the hundreds of blog posts, guidebooks and tutorial videos are dozens of free templates that can help you through every phase of your project’s life cycle. Using our free RACI template will help you guide all the project teams better, allowing them to know where they stand in relation to the project and what their level of responsibility and accountability is.

Use it at the start of the project to avoid delays and untangle any communicative knots that are preventing the project from progressing as planned. To keep your project on track, download our free RACI template and get a head start on building a workable responsibility assignment matrix.

RACI Matrix Template for Excel

Best Practices

Using our free RACI template is a good start, but you have to make sure you fill it in correctly. A responsibility assignment matrix is only as good as the effort put into creating it. Here are some best practices to apply when you’re in the process of building your assignment matrix.

  • Involve the team: They’re the ones who will be executing the work. You want their input and buy-in to avoid any costly mistakes or time-consuming questions about what wasn’t made clear at the beginning of the project.
  • Identify every single task: Identify all the tasks required to reach your final deliverable. Once you have that thorough list make sure that there is only one person on the team who is accountable.
  • Update your RACI regularly: Make sure that each new one is clearly marked as the most current version and is distributed to everyone on the team. There will be times when you’ll want to revisit the responsibility assignment matrix or changes in personnel will require an edit.
  • Share responsibility viably: One person shouldn’t have to shoulder the bulk of the responsibilities for the project and you want to give authority throughout the project team and not just among the very top management team.
  • Optimize tasks: Managers can use the RACI matrix to see if too many team members have been assigned to a task. Maybe these workers could be spread out for greater productivity. There could be too many people listed as consulted, which slows down the process. The assignment matrix is endlessly useful.

How ProjectManager Helps You Manage Projects Better

ProjectManager is a cloud-based tool that connects everyone in real-time to facilitate planning, monitoring and reporting on the project. It works to give everyone on the project team a job and the knowledge as to where they have authority and when to consult others, as well as defining the reporting process.

Let’s look at the people who are responsible, for example, the team who execute the project. Once invited into the software, you can share the project plan, assign them tasks, add detailed direction, add a deadline and tag for priority and more. The teams can then collaborate by attaching files and images to the tasks and commenting in real-time to work better together.

A screenshot of the Team collaboration user interface in ProjectManager

Those who need to stay informed of the project can do so by also getting invited into the project and sharing plans and schedules with them. Stakeholders can stay updated with reporting features that can generate reports on project variance, cost, time and more with one click. Then share them as a PDF. Reports can even be quickly filtered to zero in on the data stakeholders are interested in.

a screenshot of the status report generation screen in ProjectManager

The responsibility assignment matrix can help you reallocate your resources when things aren’t progressing as planned. Use our software to get further insight. The resource management features include a workload chart that’s color-coded so it’s easy to see who has too many tasks and who can take on more work. Then you can simply reallocate those resources from the workload page to help your team work more productively.

color-coded workload chart

ProjectManager gets you organized, keeps your team focused on their tasks and stakeholders in the loop. Gain efficiencies throughout every aspect of your project’s life cycle with an online Gantt chart to schedule work and kanban boards, a visual workflow feature that provides transparency into production. All that and it’s on a collaborative platform to keep everyone connected. Try ProjectManager today for free.

Click here to browse ProjectManager's free templates

Deliver your projects on time and on budget

Start planning your projects.

project-management.com logo.

Popular Insights:

Best Project Management Software

Mind Mapping Software

What Is a RACI Matrix?

Lauren Good Avatar

Share this Article:

Our content and product recommendations are editorially independent. We may make money when you click links to our partners. Learn more in our  Editorial & Advertising Policy .

Key takeaways

Successful project management depends on a team-wide understanding of roles and responsibilities. Using a RACI matrix to assign and define each role is a great way to keep a project on track and positioned for success.

Featured Partners

{{ POSITION }}. {{ TITLE }}

{{ TITLE }}

How Does a RACI Chart Help Project Managers?

Project managers use RACI charts to keep track of team roles and relay those responsibilities to the larger team. The matrix defines clear roles and responsibilities for individual team members across the various phases of the project, breaking the roles down into four types. Each letter of the project management acronym stands for a designation: those who are Responsible and Accountable for project deliverables, those who should be Consulted as work begins, and stakeholders who need to be Informed of ongoing progress, roadblocks, and updates. 

Read more: Project Management Phases

RACI Matrix Definitions 

Responsible.

The individual(s) with responsibility for the task or deliverable is typically responsible for developing and completing the project deliverables themselves. The responsible parties are typically hands-on team members who make direct contributions toward the completion of the project. The responsible team is comprised of the project’s “doers”, working hands-on to ensure that each deliverable is completed. 

Some examples of responsible parties are:

  • Project Managers
  • Business Analysts
  • Graphic Designers
  • Copywriters

Accountable

Accountable parties ensure accountability to project deadlines, and ultimately, accountability to project completion. This group frequently also falls under the informed category.

Some examples of accountable parties are:

  • Product Owners
  • Signature Authorities
  • Business Owners
  • Key Stakeholders

Consulted individuals’ opinions are crucial, and their feedback needs to be considered at every step of the game. These individuals provide guidance that is often a prerequisite to other project tasks, for example, providing legal guidance on a project throughout the process. If you are working on new product development or expansion, this could essentially be the entire organization.

Some examples of consulted parties are:

  • Legal Experts
  • Information Security and Cybersecurity Experts
  • Compliance Consultants

Informed persons are those that need to stay in the loop of communication throughout the project. These individuals do not have to be consulted or be a part of the decision-making, but they should be made aware of all project updates. Typically, this party are business owners or stakeholders that are more interested in viewing the project at a 30,000-foot view.  Keep this group on your cc list for awareness of topics, decisions, and progress – that includes making them part of the initial project kickoff and project demos as optional attendees. This group often also falls under the accountable group.

Some examples of informed parties are:

  • Project Committee Members
  • External Stakeholders

Read more: DACI vs RACI Model Guide

Why Are RACI Roles Important?

The same way a requirements traceability matrix provides accountability to project requirements by mapping out the relationship between these requirements and the project work, RACI roles provide a sense of organization and clarity for teams that are looking to divide roles and keep team members accountable for their contributions. Considering that 27% of projects go over budget, for reasons like scope creep and lack of defined roles, RACI roles help position a project for success and avoid common pitfalls. 

Moreover, RACI roles help ensure that communication between all roles is ongoing. When you consider that nearly half of all project spending is at risk of being wasted due to a lack of effective team-based communication, it becomes all that more important to prioritize. Ultimately, teams who prioritize communication and well-defined roles are better off, and RACI roles help teams achieve that goal faster – while providing accountability for each team member’s unique contributions to the success of the project. 

Read More: Top 10 Main Causes of Project Failure

How to Create a RACI Matrix 

If you’re looking to implement a RACI matrix as part of your team’s project planning process, take these steps to create a RACI matrix.

Ensure that you have a thorough understanding of the project and its demands before outlining any further steps by communicating with key stakeholders and decision-makers.

Determine the list of key activities and deliverables from the director of program management or other leadership. 

Determine who is needed to be a part of the project or initiative.

Determine the project roles and responsible job titles and persons for each activity and deliverable.

Hold review sessions with key members of the team for alignment, and if you haven’t already, host a kickoff meeting with the entirety of the team and key stakeholders to unveil the matrix, address questions, and more. 

If the project has already started, it’s not too late to implement a RACI matrix.

  • Outline the story. Using research from multiple sources, do a, b, c, and d.
  • Utilize steps 2 and 3 (shown above). Ensure the right groups are assigned and engaged. 
  • Hold a review session. Ensure that the team acknowledges and discusses the plan and the roles assigned.

Read more: 8 Factors That Lead to Successful Projec ts

Examples of a RACI Matrix

RACI matrix example.

As shown above, a RACI matrix helps break down what roles individuals will play as work is carried out and to what extent they will be involved in the project overall. The horizontal axis represents each person on the project team and the vertical axis represents each task.

Each square of the matrix represents an individual, a task, and that individual’s role within the project, either responsible, accountable, consulted, or informed. In this situation, for example, the project manager is accountable for accessing risk, defining performance requirements, creating designs, executing construction, and approving construction work. However, they are only informed about approving construction work and defining functional and aesthetic needs.

Read more: Understanding Different Types of Stakeholders and Their Roles

Our FREE Downloadable RACI Matrix Template

Who creates the raci matrix.

The RACI matrix — sometimes called RACI model, RACI diagram, or simply just RAC — is created by the project manager at the start of the project as a key part of establishing the initial human resources planning for the project. Because miscommunication is a common threat to any project, RACI charts are a great asset to teams dealing with any type of project, from very simple projects to extremely complex ones. 

Common Mistakes When Creating a RACI Matrix

  • Failure to plan ahead: Utilizing a RACI matrix should not be your first step in project planning. Having a fully assembled project team and at least a general idea of a task list and project plans is a better place to start before preparing a matrix.
  • Working with too large a team: A RACI matrix is likely not the best bet for a large team, as it will make the matrix hard to understand and overly complex.
  • Not communicating with the project team: A RACI matrix should help organize tasks and responsibilities that have already been introduced to the project team – no one likes to be blindsided. Be sure to host a kickoff meeting with the team first before creating a RACI matrix.

Frequently Asked Questions

Implementing a RACI matrix takes more than just a few emails and sporadic conversations – it takes consistent communication and planning. You should host a kickoff meeting to introduce the matrix to the team and make a plan to continue meeting at predetermined times throughout the project lifecycle. 

Here are a few more tips to keep in mind as you implement your RACI matrix within the team dynamic:

  • Get everyone prepared. Send the document around to the meeting distribution as read-ahead material, requesting feedback if there are any major concerns. 
  • Roll out each role for the team . During the meeting, conduct a review of the tasks and responsible parties. Do not rush through this review, but rather ensure enough time in your project kickoff for this important aspect. (Be certain to clarify the definitions of RACI to avoid ambiguity.)
  • Consider changes and update accordingly. After the meeting, send out the notes documenting acceptance or updates to the RACI. In addition to sending out the notes, request any corrections within a reasonable yet defined timeframe. Clarify that if no changes are requested, each person is acknowledging their role and committing to the project tasks as outlined.
  • Stay in touch. Consider a quick review with the entire team each quarter or every six months for longer projects to ensure it remains up-to-date and not simply another document in the repository but a relied-upon artifact.

As you implement the RACI matrix…

  • Encourage teamwork and foster collaboration whenever possible.
  • Don’t fear updates – make changes and adjustments as needed (but be sure to communicate those changes clearly to all parties).
  • Earlier is better. Roll out your matrix plan to the team BEFORE you plan to implement it for the best results. 
  • Have a clear-cut understanding of the project scope and how each role connects to the overall project goal.

For “Responsible” Parties:

  • Make sure your project’s definition of Responsible is clear on who holds the “decider” role for the project or project phase’s completion, and what the dimensions of that responsibility will be.
  • Ensure that all parties are aware of their role and responsibilities within the matrix.

For “Accountable” Parties: 

  • When multiple Accountable team members must exist, use your definitions to make clear which individual is accountable for a given project element, and how that individual needs to interact with other Accountable team members.
  • Ensure that there is only one “Accountable” party assigned per task.
  • Be sure that the Accountable party has the authority and power to oversee the task as the accountable party.

For Consulted and Informed Parties: 

  • Consulted parties are often high-level decision-makers with heavy schedules. Make sure you’re clear on their availability ahead of time.
  • Similar to Consulted parties, Informed parties are often less hands-on and have less understanding of day-to-day project operations. As the project goes on, make sure to keep detailed notes to keep the Informed party up-to-date on key information. 
  • Understand the ways that these parties like to communicate and create a plan to reach them early – whether that’s over phone calls, emails, video calls, or from within your project management system’s collaboration tools.
  • Knowing the difference between who needs to be consulted versus informed can be a challenge if there is ambiguity about project roles. Consider what aspects of the project different team members need to know to do their jobs, and then bake those into your definitions.

RACI Matrix Pros & Cons

  • Increased Engagement: RACI helps engage project participants in the project lifecycle. 
  • Enhanced Project Planning: Project managers make project planning more organized, efficient, and detailed.
  • Identifiable Improvement Opportunities: Areas of improvement are more easily identified.
  • Easier Collaboration: Use of a RACI matrix creates a clear path for leadership to sign off on project steps, as project documentation in the RACI model is heavily emphasized.
  • Better Communication: Improves overall group communication as a whole.
  • Group Accountability: Assists groups, especially larger project teams, stay connected and accountable to their roles and project goals
  • Limitations on Role Scope: The RACI model does not provide details on role scope, especially for responsible parties. These gaps in detail also affect other team roles, for example, another gap in a RACI is the determination of who is responsible for verifier and signatory.
  • Limits on Task Details and Scope: While a RACI matrix can provide an overview of who is responsible for different tasks, it will not state what needs to be done.
  • Not Aligned to the Agile Methodology: Project managers using an agile methodology like scrum may find it redundant since accountability, ownership, and ongoing communication is built into the scrum framework (i.e., product owner, scrum master, and daily standups with the team). Additionally, agile focuses on team-based delivery and accountability, while the RACI framework and alternatives focus on individual responsibility and autonomous accountability.

Read more: Top 10 Causes of Project Failure

Free RACI Matrix Templates

A number of project management software solutions include a native RACI matrix template. Here are just a few we’ve found:

Colorful RACI Chart Template

We love this template from Smartsheet because it’s colorful, thorough, and includes room for every party involved in the project. 

RACI template from smartsheet.com.

Pastel Colored RACI Matrix Template

This template from the Academy to Innovate HR is a great choice for project managers who want to organize their team roles with an easy-on-the-eyes chart that evolves beyond the simple spreadsheet. 

RACI matrix template from the Academy to Innovate HR.

Simple RACI Chart from Clickup

These RACI templates from Clickup have enough variety to fit any of your project needs, but are simple enough for even beginner PMs to use.

A simple RACI matrix from clickup.com.

Detailed RACI Matrix Template

This template is a great starter template for anyone looking to explore RACI charts in their project management strategy . As an added bonus – it comes with the RACI definitions already built in!

A detailed RACI matrix template from Vertex42.

Excel-Based RACI Chart Template

Are you an Excel or Google Sheets user looking to take advantage of the RACI matrix? An Excel-formatted template from Project Management Docs can be just the solution for you. This template is a great template for users who want a chart that comes in a pre-formatted structure.

An Excel spreadsheet-based RACI matrix from projectmanagementdocs.com

Join our newsletter

Subscribe to Project Management Insider for best practices, reviews and resources.

By clicking the button you agree of the privacy policy

{{ TITLE }}

You should also read.

Top 6 Software Development Methodologies & When to Use Them

Top 6 Software Development Methodologies & When to Use Them

Asana vs Jira: Which Is Best In 2024?

Asana vs Jira: Which Is Best In 2024?

Essential Project Management Guidelines & Rules to Follow

Essential Project Management Guidelines & Rules to Follow

Lauren Good Avatar

Get the Newsletter

You might also like.

5 Ethical Issues in Project Management & How to Handle Them

5 Ethical Issues in Project Management & How to Handle Them

Matt Klein Avatar

Senior Project Manager Job Description and Responsibilities

Bradon Matthews Avatar

Vertical vs Horizontal Project Management

  • Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Site-Logo

Ten Six Consulting

Project and Earned Value Management, Primavera P6 & Deltek Cobra & Acumen Services

What Is a Responsibility Assignment Matrix (RAM) in Project Management?

April 11, 2024 By Ten Six

What Is a Responsibility Assignment Matrix (RAM) in Project Management? A Guide

Here, we’ll explore what a RAM is, how you can create one, best practices for creating and using it effectively, as well as some common challenges with incorporating them into your projects.

What is a Responsibility Assignment Matrix (RAM)? A Responsibility Assignment Matrix (RAM) is a tool used in project management to define and assign roles, responsibilities, and authority levels for each task or activity within a project.

It includes columns for each team member’s name, their role or title, their area of expertise or skill set, and any other pertinent information related to the task at hand. The rows represent individual tasks associated with the project.

This allows managers to easily identify which team members have been assigned specific tasks and how much responsibility they have over those tasks.

The Benefits of RAM

Using a RAM provides several benefits when managing projects; such as improved communication between teams by clearly outlining roles and responsibilities; increased accountability among team members; better tracking of progress against goals; improved resource allocation based on skillset requirements; and reduced risk due to more accurate forecasting capabilities.

Additionally, it can help reduce costs by eliminating unnecessary resources from being allocated towards certain activities, while also providing greater visibility into potential issues before they arise.

Types of RAM

There are two main types of Responsibility Assignment Matrices. A Functional (F-RAM) and a Projectized (P-RAM).

  • Functional (F-RAM) – Functional RAM assigns individuals according to their functional expertise, allowing them flexibility in terms of where they work within an organization’s structure.
  • Projectized (P-RAM) – Projectized RAM assigns individuals according to their particular skillsets but requires them to remain dedicated solely towards one particular project until it’s completion, regardless if there are changes in personnel or scope during this time period.

Key Takeaway: A Responsibility Assignment Matrix (RAM) is a useful tool for project managers to assign tasks and responsibilities to team members. It can help improve communication, increase accountability, track progress more accurately and reduce risk. There are two main types of RAMs: Functional (F-RAM) and Projectized (P-RAM), each with their own advantages depending on the particular needs of the project. Overall, using a RAM can lead to better resource allocation and improved visibility into potential issues before they arise.

Best Practices for Creating and Using a RAM

Identify the project tasks and responsibilities.

The first step in creating a RAM is identifying all of the tasks required for successful completion of the project. This includes everything from planning meetings to writing reports to testing software.

Once you’ve identified all of the necessary tasks, you can then assign each task to one or more individuals who will be responsible for completing it. It’s important that everyone understands their role so they know what’s expected of them and how they fit into the overall picture.

Assign Resources to Each Task

Next, it’s time to assign resources such as personnel, equipment and materials needed for each task. Make sure that everyone has access to what they need, when they need it so there are no delays or roadblocks along the way.

Also consider any potential risks associated with certain resources so you can plan accordingly if something goes wrong during the execution of your plan.

Monitor Progress Regularly

As work progresses on your project, monitor progress closely using whatever tools are available such as status reports or dashboards. If things aren’t going according to plan due to unforeseen circumstances or other issues arise, adjust resource assignments accordingly. This could mean reassigning people from one task area to another area where more help is needed.

By monitoring progress regularly, you’ll be able to keep projects moving forward without unnecessary delays.

Regular Check-Ins

Having open lines of communication allows for quick resolution of issues or changes that may arise during the course of the project.

Update the RAM

It’s critical for the success of a project to keep the RAM updated throughout all stages. As tasks are completed or changed, it’s important to update both individual roles and responsibilities within the matrix so that everyone remains on track with their assigned tasks.

This ensures accuracy in reporting progress and makes sure no one falls behind due to lack of clarity about their duties or goals.

Key Takeaway: Creating a Responsibility Assignment Matrix (RAM) involves identifying all of the tasks and responsibilities required for successful completion of the project, assigning resources to each task,  monitoring progress regularly, regular check-ins and updating the RAM.

what is a responsibility assignment matrix

Don’t get left behind on your project! Make sure to keep your Responsibility Assignment Matrix (RAM) up-to-date with clear roles and responsibilities. Communication is key, so don’t forget to check in regularly with team members! #ProjectManagement Click To Tweet

Challenges of Using a RAM

When using a Responsibility Assignment Matrix (RAM), there are several challenges that can arise.

Lack of Clarity in Assigning Roles and Responsibilities

It’s important to ensure everyone on the team understands their specific tasks, as well as who they should report to for guidance or updates. Without this clarity, it can be difficult to effectively manage the project and hold people accountable for their work.

Overlapping Responsibilities Between Team Members

This happens when two or more people have similar duties or tasks assigned to them, which can lead to confusion about who is responsible for what part of the project. To avoid this issue, it’s important to clearly define each person’s role and make sure everyone knows exactly what they need to do and how they fit into the overall plan.

Tracking Progress and Adjusting Resources Accordingly

As changes occur throughout the project lifecycle, it may become necessary to reassign certain tasks to different resources or adjust timelines in order for everything to stay on track. Keeping an up-to-date RAM helps ensure that all stakeholders are aware of any changes that have been made. This ensures everyone remains informed about where things stand at any given time during the course of the project

Using a Responsibility Assignment Matrix (RAM) is an effective way for project managers to keep track of tasks assigned to each member on their teams. By understanding how this tool works and following best practices when creating one, they can ensure that their projects run smoothly while also helping the team stay organized throughout its duration.

Upcoming Classes

  • Join Our Mailing List
  • Name This field is for validation purposes and should be left unchanged.
  • Primavera P6 Training
  • Deltek Training
  • Earned Value Management Training
  • Project Management Training
  • Open Training Class Dates
  • Scheduling Services
  • RFP Support
  • Your EVM System
  • Certification
  • Data Analysis and Reporting
  • Post Contract Support
  • Staff Augmentation
  • WBS Guidelines for Government Acquisition Programs (MIL-STD 881D)
  • Knowledge Transfer, Mentoring and Coaching
  • BI Publisher Services
  • Primavera Unifier
  • Knowledge Transfer, Coaching and Mentoring
  • Microsoft Project to Primavera P6 Conversion Services
  • Building an Integrated Master Schedule (IMS)
  • Integrating Microsoft Project with Deltek Cobra
  • Migrating From Microsoft Project To Oracle Primavera P6
  • Deltek Acumen
  • Deltek Cobra
  • Earned Value Mgmt
  • Microsoft Project
  • Primavera P6
  • Project Management
  • Risk Management

loading

Transform teamwork with Confluence. See why Confluence is the content collaboration hub for all teams.  Get it free

  • The Workstream
  • Project management

How to use RACI charts for project management

Browse topics.

Effective project management is essential for the success of any project, but the complexities involved can often lead to confusion and inefficiencies. One common challenge is the lack of clarity in roles and responsibilities, which can cause delays and errors. Ultimately, project managers must strive for a process where everyone knows what is expected of them and by whom, leading to a streamlined and efficient workflow. 

This vision can become a reality using a RACI framework or RASCI matrix. In this guide, we’ll explore the components of a RACI chart, the steps to create one, and best practices for implementing it in the project management process.

What is a RACI chart?

A RACI chart, or responsibility assignment matrix, is a project management tool that defines and clarifies roles and responsibilities within a project team. It helps establish clear communication, improve decision-making, and ensure accountability for tasks or deliverables. A RACI chart stands for:

  • R esponsible: The responsible individual is delegated a responsibility from the accountable person and must complete that responsibility within agreed-upon parameters and an agreed-upon deadline. A task may have more than one responsible individual.
  • A ccountable: The accountable individual ensures that all the responsible members complete the task. Accountabilities should not be delegated; it is best to assign the task to a single individual who can serve as the decision-maker and guide.
  • C onsulted: The consulted individual is the team's knowledge-holder. They’re available for help, extra context, and advice on the task. Identify these people early on so you can incorporate them into the project and its workflow. 
  • I nformed: The informed party is typically a stakeholder, leadership team, or approver who wants and needs information about the team’s project. Ensuring there is an informed party promotes internal transparency, team alignment, and accurate project timelines.

You can use RACI charts in conjunction with other project planning tools, such as flowcharts , Gantt charts , agile project management frameworks, project scheduling software , and project roadmaps to provide a comprehensive view of roles and responsibilities across project phases .

RAPID vs DACI vs RACI

The RACI matrix is separate from similar-sounding models RAPID and DACI. Teams use these models to guide them through decision-making before taking action on a project, but they don't clarify team members' roles and responsibilities. These are the main distinctions:

Framework name

RAPID

Framework name

DACI

Framework name

RACI

Recommend, Agree, Perform, Input, and Decide

Decision making

Driver, Approver, Contributor, and Informed

Decision making

Responsible, Accountable, Consulted, Informed

Project management

When to use a RACI framework

Understanding when and how to use a RACI chart can significantly boost project efficiency and clarity. Below are vital times to use a RACI framework.

At the start of a project : Defining who is responsible, accountable, consulted, and informed from the outset sets clear expectations and communication channels. This clarity helps prevent issues by ensuring everyone understands their roles, fostering collaboration, reducing ambiguity, and increasing the likelihood of meeting deadlines.

For complex projects with many team members : With multiple stakeholders, the risk of overlapping responsibilities and miscommunication rises. A RACI chart simplifies these complexities by outlining specific duties and communication pathways for smooth coordination and reduced confusion.

During organizational changes : A RACI chart keeps roles clear during restructuring or personnel shifts. It provides stability, aligns new team members with project goals , and is an effective onboarding tool by outlining responsibilities and integration into the project roadmap.

During agile transitions : A RACI chart clarifies roles and processes during agile transitions. It defines responsibilities for scrum roles , such as product owner and scrum master , and outlines participation in events such as sprint planning and code reviews . This clarity eases the agile transition by providing structure.

During project reviews , a RACI chart maintains accountability and responsibility and helps identify bottlenecks or deviations. Regular updates allow for role reassignment as necessary to address challenges or changes in scope. This process supports a structured, responsive project management approach, contributing to success.

The benefits of RACI charts

RACI charts offer many benefits to businesses, including:

  • Enhanced clarity in roles and responsibilities : RACI charts clarify roles by identifying who is responsible, accountable, consulted, and informed for each task, minimizing confusion and overlap.
  • Centralized communication : RACI charts are a central hub for role-related information and streamlining communication.
  • Increased accountability : RACI charts clarify accountability by assigning a specific party for each task and subtask.
  • Better project planning and management : Clear roles and responsibilities help create realistic timelines and allocate resources effectively. Knowing who is responsible for each project part allows managers to address potential bottlenecks proactively.

The limitations of RACI charts

While RACI charts offer many benefits, they do have some limitations. 

  • Teams may rely too much on them, neglecting other crucial communication and project management aspects.
  • RACI charts clarify task involvement but don't offer guidance on performing tasks, resulting in inconsistencies caused by varied interpretations of responsibilities.
  • RACI charts outline responsibilities but don't account for the dynamic nature of projects.

To address these limitations, you should use RACI charts with other agile practices , such as daily standups , retrospectives , and continuous improvement . You can supplement them with detailed process documentation or RACI templates for specific project phases or deliverables.

Creating a RACI Chart

Creating a RACI chart involves steps to accurately reflect each team member's roles and responsibilities. Follow the steps below to boost your project efficiency and team clarity.

Step 1: Identify tasks and workload

First, outline the core tasks. Let's picture a scenario where a team is launching a new website. This first step might involve designing a homepage wireframe, creating graphics and animations, identifying SEO keywords, setting up the domain and server, and writing homepage copy.

You should work with your team to identify subtasks to avoid issues that could disrupt your workflow and delay deliverables.

Step 2: Identify roles

Discuss the role and responsibilities with your team collaboratively. A roles and responsibilities template can simplify this process.

In the website scenario, graphic design tasks might include: 

  • Creating graphics and animations (Ariel) 
  • Designing a website hero image (Natalie) 
  • Reviewing and approving a hero image (Tessa) 
  • Animating the hero image and converting it to .mp4 (Anji)  
  • Integrating the finalized hero image into the wireframe (Ariel) 

For these specific tasks, Natalie and Anji focus on contributing to the design and animation, Tessa makes sure the initial image aligns with brand guidelines, and Ariel oversees the project, ensuring the final product fits the wireframe.

Step 3: Build your chart

With a clear understanding of each person's responsibilities, you can organize these tasks and roles into a chart to properly communicate with the team and track your progress.

Step 4: Analyze your chart and identify gaps

Conduct a session with your team to identify gaps or overlaps in the chart.  This prevents duplicative work and catches any roadblocks before they happen. Follow general guidelines for your RACI model, from identifying gaps and overlaps to analyzing the balance between assignees.

Expect some overlaps and dependencies, and ensure there is always one accountable individual per task. This person acts as the task-level "project lead," driving the process to avoid having more than one person in charge.

Limit the number of both responsible and consulted individuals. Too many Rs can create confusion, leading to neglected tasks. Too many Cs can result in conflicting opinions, so ensure responsible individuals receive clear directives.

Conversely, having too few “I”s suggests a lack of upward communication and transparency, so ensure leadership and stakeholders are fully informed and supportive to facilitate smooth approval and implementation.

Using a RACI chart in Confluence

Integrating your RACI matrix into Confluence documents enhances project communication and accountability.

Here's how to add a RACI matrix in Confluence:

  • Click "Insert" on the top toolbar and select "Table" from the dropdown menu.
  • Choose the number of rows and columns necessary for your RACI chart in the table dialog box. For example, for a project with four tasks, set up a table with five rows and five columns.
  • The first row should include the following headers: Task , Responsible , Accountable , Consulted , and Informed .
  • Fill in the table with the relevant information. Assign the appropriate RACI code to each team member for each task or activity. You can use this table on any pertinent project Confluence page, such as project charters and kick-off agendas , or by adding the page as a Trello card or within a Jira issue .

RACI chart best practices

RACI matrix best practices include keeping your chart simple, involving team members in the process, regularly reviewing your chart, documenting changes, and ensuring consistency.

Keep it simple

The RACI chart should be straightforward and user-friendly. To enhance accessibility, use visual aids such as colors or symbols in Confluence. Keep the chart concise, highlighting only crucial tasks and responsibilities—track subtasks using Trello or Jira.

Include team members in the process

Tag all team members involved in the project when updating the chart so everyone is aware of changes and understands their roles. Use comments in Confluence or direct messages to communicate updates asynchronously.

Review and update regularly

Regularly review and update your RACI charts to reflect the project’s current state. Verify that roles are current, tasks are completed, and dependencies are clear. Schedule reviews and updates using Confluence and assign a team member to oversee the process.

Document changes

Document changes to the RACI chart in Confluence, including the date, the person responsible, and the reason for the change to keep everyone informed and aware of the rationale behind updates.

Ensure consistency

Ensure your charts and assignments are consistent. Establish clear guidelines for chart usage and ensure all team members understand them. Use Marketplace add-ons , templates , or macros in Confluence to maintain consistency across projects and teams.

Enhance team efficiency with RACI charts

RACI charts streamline project management, foster clear communication, and enhance team accountability. Simplify charts, involve team members, review progress regularly, and document changes meticulously to ensure a seamless workflow and successful project outcomes.

To boost your project management capabilities, consider using Confluence , which offers the following:

  • Centralized documentation : Store RACI charts so all team members can easily access the latest version.
  • Collaboration and transparency : Collaborate on creating and updating the RACI chart to keep everyone aligned.
  • Integration with Jira : Link tasks and issues directly to the RACI chart for better context and traceability.
  • Customization and templates : Use customizable templates and macros, like the Page Properties macro, for clear and appealing RACI charts.
  • Version control : Track changes over time and revert to previous versions if necessary.
  • Accessibility and sharing : Easily share RACI charts with team members, stakeholders, and external parties.

Create and maintain RACI charts more efficiently, clarify roles and responsibilities , improve communication, and increase project success. Make a RACI chart in Confluence for free .

You may also like

Project poster template.

A collaborative one-pager that keeps your project team and stakeholders aligned.

Project Plan Template

Define, scope, and plan milestones for your next project.

Build graphic design and animations

Design homepage wireframe

Identify SEO keywords

Set up domain and server

Write homepage copy

Natalie (design),
Anji (animation)

Ariel

Tessa (review)

David (Head of Design), Marjorie (Director of Marketing)

Andrej (design),
Chris (code)

Ariel

Adam (Web Admin)

David (Head of Design), Marjorie (Director of Marketing)

Jenna (SEO Manager)

Paul

Grace (Demand Gen Manager)

Adam (Web Admin), Marjorie (Director of Marketing)

Breanna (Operations Manager)

Ariel

Tricia (Finance Director), Adam (Web Admin)

Adam (Web Admin), Marjorie (Director of Marketing)

Edwin (copywriting),
Felicia (edits)

Paul

Jenna (SEO Manager)

Marjorie (Director of Marketing)

Enable faster content collaboration for every team with Confluence

Copyright © 2024 Atlassian

what is a responsibility assignment matrix

  • Onsite training

3,000,000+ delegates

15,000+ clients

1,000+ locations

  • KnowledgePass
  • Log a ticket

01344203999 Available 24/7

what is a responsibility assignment matrix

Responsibility Assignment Matrix: A Complete Overview

Dive into the world of Responsibility Assignment Matrix (RAMs), which helps assign roles and responsibilities and how they streamline Project Management. This comprehensive blog explains their purpose, benefits, and practical use, enabling effective role definition and accountability in project teams. Continue reading!

stars

Exclusive 40% OFF

Training Outcomes Within Your Budget!

We ensure quality, budget-alignment, and timely delivery by our expert instructors.

Share this Resource

  • Project and Infrastructure Financing Training
  • Waterfall Project Management Certification Course
  • Jira Training
  • CGPM (Certified Global Project Manager) Course
  • Project Management Office Fundamentals Certification Course

course

This comprehensive blog aims to provide you with a complete overview of the Responsibility Assignment Matrix and its pivotal role in Project Management and organisational structure. 

Table of Content 

1) What is a Responsibility Assignment Matrix in Project Management? 

2)  Responsibility Assignment Matrix (RAM) goal in Project Management 

3) How to create a Responsibility Assignment Matrix? 

4) Benefits of Responsibility Assignment Matrix 

5) Developing Responsibility Assignment Matrix (RAM) best practices 

6) Conclusion  

What is a Responsibility Assignment Matrix in Project Management? 

A Responsibility Assignment Matrix (RAM) in Project Management is a tool that outlines and defines the roles and responsibilities of individuals or groups involved in a project. Its purpose is to ensure that everyone understands their specific duties and tasks. The primary purpose of a RAM is to bring clarity to the project structure, helping to prevent confusion, overlap, and accountability issues throughout the project lifecycle.

RAM in Project Management is also known as Responsible, Accountable, Consulted and Informed (RACI). RACI represents different levels of roles and responsibilities for individuals or teams:

a) Responsible: The individual or group in responsible for finishing a certain job or project. They are the ones who perform the work.

b) Accountable: The individuals who have complete responsibility and decision-making authority over the job or result. They ensure that the task is completed and of satisfactory quality.

c) Consulted: Individuals or stakeholders are consulted for their views or skills before to making a decision or taking actions. They contribute essential insights but may not be directly responsible for the task.

d) Informed: Individuals or stakeholders who need regular updates on the task’s progress or result. They are not actively involved in its conclusion, but they must be notified of any advancements.  

Project Management Courses

Responsibility Assignment Matrix goal in Project Management 

The primary goal of a Responsibility Assignment Matrix in Project Management is to clearly define and communicate the Roles and Responsibilities of Project Managers and individuals or teams involved in a project. Here are the key goals of using a RAM in Project Management: 

a) Clear roles and responsibilities: The RAM establishes clear roles and responsibilities for each team member, minimising confusion and conflicts.

b) Enhanced communication: Documenting roles and responsibilities concisely in the RAM facilitates effective communication within the project team. Also, enabling quick identification of contacts for specific issues or inquires.

c) Conflict resolution: BY operating a reference point, the RAM helps to resolve conflicts or misunderstandings about responsibilities, providing a foundation for conversation and conflict resolution.

d) Improved project control: With the RAM in place, Project Managers and stakeholders can more easily monitor project progress, identifying task accountability and monitoring work package status.

e) Efficiency and accountability: By allocating responsibility to each project aspect, the RAM promotes accountability among team members, resulting in increased efficiency as everyone understands their duties and expectations.

f) Risk Management: The clear roles of RAM help detect potential hazards associated with functional gaps or overlaps in the Risk Management Process , enabling proactive risk mitigation strategies.  

g) Optimal Resource Allocation: Project managers can optimise resource allocation by understanding task ownership and workload distribution as described in the RAM.

Ready to lead digital service projects to success? Register for our CDSPM (Certified Digital Services Project Manager) Course  today!   

How to create a Responsibility Assignment Matrix? 

How to Create a Responsibility Assignment Matrix

Identify the project scope 

Start by recognising the project's scope or the exact purpose for which you are building RAM. This includes establishing project objectives, outcomes, and critical milestones.

Define roles and responsibilities 

a) Identify the key roles involved in the project. Common roles may include Project Manager, Team Leader, Team Member, Stakeholders, and other relevant positions. 

b) Clearly define the responsibilities associated with each role. These responsibilities should be specific and measurable so there is no ambiguity. 

Choose a framework - RACI, RASCI, or DACI 

a) Select a framework for your RAM. The most commonly used frameworks are RACI, RASCI, and DACI: 

b) RACI: RACI   Stands for Responsible, Accountable, Consulted, and Informed. It outlines who is in charge of a task, who is answerable for following it through to completion, who should be consulted, and who should be informed. 

c) RASCI: RASCI Similar to RACI, but with an additional role, the "S" for Support. This framework further clarifies who provides support for a task. 

d) DACI: This framework is similar to RASCI but adds the role of Driver. The Driver is responsible for ensuring that a task is completed. 

Assign roles using the framework 

a) For each task or work package within the project, assign the relevant roles using the chosen framework. Each task should have a Responsible person, an Accountable person, and, if necessary, people who need to be Consulted, Informed, or Supported. 

b) Be specific and ensure that there is only one person designated as "Accountable" for each task to avoid confusion. 

Document the RAM 

a) Create a table or chart that lists all the tasks or work packages on one axis and the identified roles on the other. 

b) Fill in the matrix with the appropriate role designations (R, A, C, I, S, D) for each task and role. 

Review and validate 

Share the RAM with the project team and stakeholders for evaluation and approval. Confirm that everyone agrees on the roles and responsibilities.

Implement and communicate 

Once the RAM has been completed and approved, communicate it to the project team and other stakeholders. Ensure that everyone understands their jobs and responsibilities. 

Regularly update the RAM 

As the project evolves, it is critical to improve the RAM as necessary. Roles and duties might shift, and new tasks may develop. Keep the RAM current to reflect the project's evolving needs.

Unlock your potential with our Project Management Courses now! 

Benefits of Responsibility Assignment Matrix

Benefits of Responsibility Assignment Matrix

a) Clarify roles and responsibilities: A RAM clearly defines who is responsible for each task, which helps prevent confusion and ensures that team members understand their roles.

b) Improved communication: The RAM serves as a central reference point for roles and responsibilities, promoting effective communication within the project team. Team members can quickly identify who to contact for specific issues or questions.

c) Conflict resolution: When there is a dispute or ambiguity regarding responsibilities, the RAM provides a basis for discussion and conflict resolution. It helps identify where accountability lies and facilitates problem-solving.

d) Enhanced project control: The RAM allows Project Managers and stakeholders to monitor and manage the project's development.  It helps you to track the status of assignments and ensure that tasks are getting done as planned.

e) Efficiency and accountability: Clearly defined roles and responsibilities create a sense of responsibility among team members, maybe resulting in improved productivity. When people understand what is required of them, and they are more likely to fulfil it.

f) Resource allocation: The RAM helps Project Managers optimise resource allocation by understanding who is responsible for specific tasks. This ensures that workloads are distributed evenly and that resources are used efficiently. 

Developing Responsibility Assignment Matrix best practices 

Developing a Responsibility Assignment Matrix is a critical aspect of project management. To create an effective RAM, consider the following best practices: 

a) Involve key stakeholders: Define roles and responsibilities after consulting with project stakeholders in regards with Stakeholder Analysis , team members, and subject matter experts. Their participation can provide useful information about the project's objectives. 

b) Keep it simple: Use a simple framework (e.g., RACI, RASCI, or DACI) that team members are able to quickly understand and use.

c) Use clear and specific language: In order to prevent confusion, write tasks clearly and precisely. Avoid using confusing or unclear terms that may lead to confusion.

d) Designate a single "accountable" person: Assign only one person as "Accountable" for each task. This individual is ultimately responsible for the task's completion. Multiple accountable persons can lead to confusion and accountability issues. 

e) Consult and inform appropriately:   It is important to carefully consider the individuals who need to be consulted and informed for each task. Avoid unnecessary involvement, which can lead to inefficiency. Ensure that the right people are included in these roles. 

f) Review and validate with the team: Share the RAM with the project team and stakeholders for feedback and validation. Ensure that all parties agree with the assigned roles and responsibilities. 

g) Document assumptions and clarifications: If certain roles and responsibilities are based on assumptions or require clarification, document these notes alongside the RAM. This can help avoid misunderstandings in the future. 

Join our Project Management Certification today and take the leap towards becoming a project management expert!

Conclusion  

A Responsibility Assignment Matrix is an important tool in Project Management and organisational systems. Its importance comes from its capacity to define, assign, and explain the roles and responsibilities, resulting in improved project effectiveness and performance.

Take the next step in your project management career with our Certified Global Project Manager (CGPM) Course !  

Frequently Asked Questions

Creating a Responsibility Matrix is appropriate for the project's initiation stage. It outlines roles, duties, and communication channels to promote responsibility throughout the project's lifecycle. 

The Responsibility Assignment Matrix or RACI model divides tasks as Responsible, Accountable, Consulted, or Informed. It promotes transparency and accountability among the project group.

The Knowledge Academy takes global learning to new heights, offering over 30,000 online courses across 490+ locations in 220 countries. This expansive reach ensures accessibility and convenience for learners worldwide. 

Alongside our diverse Online Course Catalogue, encompassing 17 major categories, we go the extra mile by providing a plethora of free educational Online Resources like News updates, Blogs , videos, webinars, and interview questions. Tailoring learning experiences further, professionals can maximise value with customisable Course Bundles of TKA .  

The Knowledge Academy’s Knowledge Pass , a prepaid voucher, adds another layer of flexibility, allowing course bookings over a 12-month period. Join us on a journey where education knows no bounds.

The Knowledge Academy offers various Project Management Courses , including Introduction to Project Management Certification Course, Certified Digital Services Project Manager and Project Management Course. These courses cater to different skill levels, providing comprehensive insights into Types of Project Managers .

Our Project Management Blogs cover a range of topics related to Project Management, offering valuable resources, best practices, and industry insights. Whether you are a beginner or looking to advance your Project Management skills, The Knowledge Academy's diverse courses and informative blogs have you covered.  

Upcoming Project Management Resources Batches & Dates

Fri 13th Sep 2024

Fri 11th Oct 2024

Fri 8th Nov 2024

Fri 13th Dec 2024

Fri 10th Jan 2025

Fri 14th Feb 2025

Fri 14th Mar 2025

Fri 11th Apr 2025

Fri 9th May 2025

Fri 13th Jun 2025

Fri 18th Jul 2025

Fri 15th Aug 2025

Fri 12th Sep 2025

Fri 10th Oct 2025

Fri 14th Nov 2025

Fri 12th Dec 2025

Get A Quote

WHO WILL BE FUNDING THE COURSE?

My employer

By submitting your details you agree to be contacted in order to respond to your enquiry

  • Business Analysis
  • Lean Six Sigma Certification

Share this course

Our biggest summer sale.

red-star

We cannot process your enquiry without contacting you, please tick to confirm your consent to us for contacting you about your enquiry.

By submitting your details you agree to be contacted in order to respond to your enquiry.

We may not have the course you’re looking for. If you enquire or give us a call on 01344203999 and speak to our training experts, we may still be able to help with your training requirements.

Or select from our popular topics

  • ITIL® Certification
  • Scrum Certification
  • ISO 9001 Certification
  • Change Management Certification
  • Microsoft Azure Certification
  • Microsoft Excel Courses
  • Explore more courses

Press esc to close

Fill out your  contact details  below and our training experts will be in touch.

Fill out your   contact details   below

Thank you for your enquiry!

One of our training experts will be in touch shortly to go over your training requirements.

Back to Course Information

Fill out your contact details below so we can get in touch with you regarding your training requirements.

* WHO WILL BE FUNDING THE COURSE?

Preferred Contact Method

No preference

Back to course information

Fill out your  training details  below

Fill out your training details below so we have a better idea of what your training requirements are.

HOW MANY DELEGATES NEED TRAINING?

HOW DO YOU WANT THE COURSE DELIVERED?

Online Instructor-led

Online Self-paced

WHEN WOULD YOU LIKE TO TAKE THIS COURSE?

Next 2 - 4 months

WHAT IS YOUR REASON FOR ENQUIRING?

Looking for some information

Looking for a discount

I want to book but have questions

One of our training experts will be in touch shortly to go overy your training requirements.

Your privacy & cookies!

Like many websites we use cookies. We care about your data and experience, so to give you the best possible experience using our site, we store a very limited amount of your data. Continuing to use this site or clicking “Accept & close” means that you agree to our use of cookies. Learn more about our privacy policy and cookie policy cookie policy .

We use cookies that are essential for our site to work. Please visit our cookie policy for more information. To accept all cookies click 'Accept & close'.

  • Memberships

Responsibility Assignment Matrix: the Basics and Template

Responsibilty Assignment Matrix - Toolshero

Responsibility Assignment Matrix (RAM): this article explains the Responsibility Assignment Matrix or RAM for short in a practical way. Next to what it is (including an in-depth explanation video), this article also highlights an example, inlcuiding the steps to conduct, to use it during a complex project and downloadable and editable Responsibility Assignment Matrix template to get started. Enjoy reading!

What is the Responsibility Assignment Matrix or RAM?

Project managers like using a RAM to identify the role of the various members of a project team. This matrix is a structural chart in which is visually made clear (on paper or through project management software ) what should be done by whom in cross functional or departmental projects.

In the matrix it is clear what the project tasks, roles and responsibilities are of each of the project team members. It is also referred to as the RACI matrix , VERI matrix or Linear Responsibility Chart (LCR).

Free Toolshero ebook

It’s often used as an integral part of the Work Breakdown Structure .

Responsibility Assignment Matrix (RAM) video (in depth-explainer)

Watch the in-depth video below for a recap of what you’ve just read, so you will remember it more easily!

Responsibility Assignment Matrix example

Despite the simple nature of all information in the matrix memory, it can be very time-consuming to assign each member of the project team with the right tasks and responsibilities.

In addition the appropriate roles must be defined in advance before they are included in the RAM.

RACI Matrix example - toolshero

Figure 1 – The Responsibility Assignment Matrix (RAM) / RACI Matrix

To do this well and accurately, the matrix can be completed using the following steps:

  • Step 1: Identify all the participants and (facilities) supporters of the project.
  • Step 2: Identify all the deliverables for the project.
  • Step 3: Discuss with all team members how they can support each other to achieve the best performance. It is important to define each participant’s responsibilities so that there will be no misunderstandings on who is responsible for completing the tasks at hand.
  • Step 4: The initial draft of the RAM is created, with the activities in the left-hand column and the team members in the project in the first right-hand column. Enter the roles that each person will have in the cells that have been formed. An example of this can be seen in the form of a RACI chart (Responsible, Accountable, Consulted and Informed) above. Note that only one person can be accountable for each task.
  • Step 5: Have the participants in the project approve the RAM (in writing). Again to prevent misunderstandings.
  • Step 6: Any remarks on changes in the RAM can be filed by the participants in writing. Finally, the responsibility assignment matrix will be reviewed and after approval has been obtained, the project can start.
  • Step 7: Interim assessment is important. When it appears that it is better to adjust the RAM, you will have to go back to step 3 and the adjustments must be discussed with all team members.

Responsibility Assignment Matrix and complex projects

The RAM is also suitable for complex projects. When activities are overlooked and the matrix contains incomplete and/or inaccurate information, this will lead to duplicated efforts.

It is therefore advisable to ensure that all information is included in the matrix and that all information is and remains accurate.

The following suggestions contribute to a larger chance of success of a matrix in a complex project:

1. Hierarchy of charts

Divide the RAM into separate graphs so that a distinction can be made according to priorities .

The RAM with the highest levels identifies the high-priority activities within the project.

From this point RAM-graphs can be developed that have been derived from this higher level.

2. Involvement

By involving all the members of the project team in the development of the RAM, they will know exactly what is expected of them and they will participate and be (more) committed to using their own specializations.

3. Written representation

By putting the RAM in writing, any mistakes or problems can be identified.

Moreover, the participants in the project will have a better understanding of what their joint participation in the project is.

Role identification

In a RAM the role of the individual and the role of the group are not separated. The role describes the participation with accompanying tasks of the individual in the project.

Such a role can be performed by several people in a group.

Vice versa, one person may have several roles in the project. This is why several employees can have the role of project manager and one individual may have the role of manager and task performer.

Responsibility Assignment Matrix template

Start visualizing what the tasks and responsibilities are of each team member with this ready to use RAM template.

Download the Responsibility Assignment Matrix template

Join the Toolshero community

It’s Your Turn

What do you think? Is the Responsibility Assignment Matrix in today’s modern project- and stakeholder management? Do you recognize the practical explanation or do you have more additions? What are your success factors for good stakeholder management during a project?

Share your experience and knowledge in the comments box below.

More information

  • Project Management Institute (2010). A Guide to the Project Management Body of Knowledge ( PMBOK Guide) . PMI Standards Committee.
  • Baker, D. (2009). Multi-Company Project Management: Maximizing Business Results Through Strategic Collaboration . J Ross.
  • Cleland, D. and Ireland, L. (2006). Project management: strategic design and implementation . McGraw-Hill .

How to cite this article: Mulder, P. (2012). Responsibility Assignment Matrix (RAM) . Retrieved [insert date] from Toolshero: https://www.toolshero.com/project-management/responsibility-assignment-matrix/

Original publication date:: 03/26/2012 | Last update: 06/28/2024

Add a link to this page on your website: <a href=”https://www.toolshero.com/project-management/responsibility-assignment-matrix/”>Toolshero: Responsibility Assignment Matrix (RAM)</a>

Did you find this article interesting?

Your rating is more than welcome or share this article via Social media!

Average rating 4.3 / 5. Vote count: 4

No votes so far! Be the first to rate this post.

We are sorry that this post was not useful for you!

Let us improve this post!

Tell us how we can improve this post?

Patty Mulder

Patty Mulder

Patty Mulder is an Dutch expert on Management Skills, Personal Effectiveness and Business Communication. She is also a Content writer, Business Coach and Company Trainer and lives in the Netherlands (Europe). Note: all her articles are written in Dutch and we translated her articles to English!

Related ARTICLES

Critical Chain Project Management - Toolshero

Critical Chain Project Management (CCPM) method

Gantt chart - Toolshero

Gantt Chart explained plus template

prince2 prince ii project management toolshero

Prince2 Methodology: Phases and Principles

Project Scope Control - toolshero

Scope Control for effective Project Management

WBS Work Breakdown Structure - toolshero

Work Breakdown Structure (WBS): Basics and Template

Request for Quotation template - Toolshero

Request for Quotation (RFQ): Basics and Template

Also interesting.

SMART Goals - Toolshero

SMART Goals: The Acronym with examples and a Template

Rose of Leary - Toolshero

Rose of Leary model explained including a Test

Five functions of management - Toolshero

Five Functions of Management by Henri Fayol

Leave a reply cancel reply.

You must be logged in to post a comment.

BOOST YOUR SKILLS

Toolshero supports people worldwide ( 10+ million visitors from 100+ countries ) to empower themselves through an easily accessible and high-quality learning platform for personal and professional development.

By making access to scientific knowledge simple and affordable, self-development becomes attainable for everyone, including you! Join our learning platform and boost your skills with Toolshero.

what is a responsibility assignment matrix

POPULAR TOPICS

  • Change Management
  • Marketing Theories
  • Problem Solving Theories
  • Psychology Theories

ABOUT TOOLSHERO

  • Free Toolshero e-book
  • Memberships & Pricing
  • Product overview
  • All features
  • Latest feature release
  • App integrations

CAPABILITIES

  • project icon Project management
  • Project views
  • Custom fields
  • Status updates
  • goal icon Goals and reporting
  • Reporting dashboards
  • workflow icon Workflows and automation
  • portfolio icon Resource management
  • Capacity planning
  • Time tracking
  • my-task icon Admin and security
  • Admin console
  • asana-intelligence icon Asana AI
  • list icon Personal
  • premium icon Starter
  • briefcase icon Advanced
  • Goal management
  • Organizational planning
  • Project intake
  • Resource planning
  • Product launches
  • View all uses arrow-right icon

Featured Reads

what is a responsibility assignment matrix

  • Work management resources Discover best practices, watch webinars, get insights
  • Customer stories See how the world's best organizations drive work innovation with Asana
  • Help Center Get lots of tips, tricks, and advice to get the most from Asana
  • Asana Academy Sign up for interactive courses and webinars to learn Asana
  • Developers Learn more about building apps on the Asana platform
  • Community programs Connect with and learn from Asana customers around the world
  • Events Find out about upcoming events near you
  • Partners Learn more about our partner programs
  • Asana for nonprofits Get more information on our nonprofit discount program, and apply.
  • Project plans
  • Team goals & objectives
  • Team continuity
  • Meeting agenda
  • View all templates arrow-right icon
  • Project management |

Your guide to RACI charts, with examples

Julia Martins contributor headshot

Can you identify exactly who’s doing what by when for each task, milestone, and deliverable in your project? If not, you might need a RACI chart.

RACI is an acronym to help teams clarify project roles and figure out who the responsible party is for any given task. Whether you've never heard of RACI before or you’re considering creating a RACI chart for your next project, here’s everything you need to know about how to create and use these charts.

What is a RACI chart?

Responsible.  This person is directly in charge of the work. There should only ever be one Responsible role per task so you know who to go to with questions or updates. If a task has more than one Responsible person, you can lose clarity and cause confusion. Instead, aim to add additional collaborators as some of the other RACI roles, which can have more than one person.

Accountable.  The Accountable person is responsible for overseeing overall task completion, though they may not be the person actually doing the work. There are two ways to assign an Accountable role. Sometimes, the Accountable is the project manager (or even the Responsible, though in that case the person is taking on two different roles during the task workflow). In these cases, the Accountable is responsible for making sure all of the work gets done. In other cases, the Accountable is a senior leader or executive who is responsible for approving the work before it’s considered complete. Like the Responsible role, there should only ever be one Accountable.

Consulted.  This will be the person or people who should review and sign off on the work before it’s delivered. There may be multiple Consulted roles for each task,  project milestone , or deliverable.

Informed.  This is the person or group of people who are informed about the progress and completion of work. They probably are not involved in any other aspect of the deliverable.

When should I create RACI charts?

RACI charts are a helpful way to track each stakeholder’s role for a task, milestone, or deliverable—especially if you’re managing a complex project with many decision makers and subject matter experts. With a RACI chart, you can prevent poor decision making and avoid roadblocks in the approvals process that could impact overall project success.

These charts, while different from PERT charts , are especially useful if your stakeholders may be taking on different roles throughout the project. For example, there could be a stakeholder who is Responsible on one deliverable but Informed on another. With a RACI chart, you can clearly outline these details and make sure everyone knows who’s responsible for what.

Example of a RACI chart

To build a RACI chart, list every task, milestone, or deliverable for your project. Then, identify who the Responsible, Accountable, Consulted, and Informed team members are for each one.

Let’s say you’re updating the homepage on your website.  Project stakeholders  include:

Head of website

Web developer

You want to create a RACI chart for five tasks and deliverables:

Update homepage CTAs

Update customer story on homepage

Revamp website design

Improve homepage loading speed

Update homepage design

The RACI chart would look like:

Responsible: Copywriter

Accountable: Web developer

Consulted: Head of website

Informed: Designer

Revamp video on homepage

Responsible: Designer

Informed: Copywriter

Responsible: Web developer

Informed: Copywriter & Designer

Pros and cons of RACI charts

Ultimately, the question is: should you create a RACI chart? While RACI charts are a useful tool to identify project responsibilities, they can get a little cumbersome over the lifecycle of a project. Here are the pros and cons of creating a RACI chart for your team’s work:

The benefits of RACI charts

Clear project roles and responsibilities can help your team move fast and reduce confusion about who’s working on what. With a RACI chart, you can ensure you don’t have two team members working on the same thing. As a result, you’ll have an easier time  collaborating  with your team.

RACI charts are also particularly helpful when the decision-making process is split between tasks. There might be scenarios where the Informed on one task or milestone is the Responsible or Consulted on another—in order to have that clearly defined, it’s helpful to track this work in a RACI chart.

RACI chart pitfalls (and how to avoid them)

RACI models focus on the granular, instead of capturing work at the project level. You might know who the Consulted is on a particular task—which is helpful—but knowing that doesn’t help you understand how various stakeholders interact with the broader project work.

Additionally, if you attempt to write out each task and each role, your RACI chart can get bulky. Worse, if your project changes in some way, your RACI chart would immediately become outdated. That can make it hard for you to gain real-time clarity about where each task is in your project workflow.

RACI charts are limited because they aren’t able to adapt to your project needs in real time. In order to establish clear expectations and eliminate confusion on the project level, you need a  project management tool .

Take your RACI chart to the next level

With project management software, every task has an assignee—that’s the Responsible. You can see work on the project level, so the Accountable and Informed don’t have to check in via email or status meetings. And, for any approvals you need from your Consulted, you can track reviews and approvals in one place. That way, your entire RACI team has a central source of truth for all of the work being done.

[Product UI] Brand campaign RACI chart (Lists)

Instead of having your RACI chart separate from where the work is happening, project management tools capture the topic, assignee, and other important information like the task due date or relative importance. That way, your entire project team has visibility into who’s doing what by when—and you’re not relying on a single person to manage and update your RACI chart. Project management tools update in real time, so you can see exactly where you are in the approval process.

Track who’s doing what by when

Clear team roles and responsibilities help you hit your deliverables on time. Tracking different and complex stakeholder responsibilities in a RACI chart can help you do that—but RACI charts are just the beginning. Learn more about  work management , and how your team can benefit.

Related resources

what is a responsibility assignment matrix

Waterfall, Agile, Kanban, and Scrum: What’s the difference?

what is a responsibility assignment matrix

New site openings: How to reduce costs and delays

what is a responsibility assignment matrix

8 steps to write an effective project status report

what is a responsibility assignment matrix

Provider onboarding software: Simplify your hiring process

PM Study Circle

What is a Responsibility Assignment Matrix (RAM) in Project Management?

Fahad Usmani, PMP

March 30, 2024

A responsibility assignment matrix (RAM) in project management is a key document that distinguishes stakeholders’ roles and responsibilities. The RACI chart is the most popular example of a RAM that clarifies stakeholders’ roles and defines their involvement.

RACI stands for Responsible, Accountable, Consulted, and Informed. Each team member in the RACI chart has at least one role.

All stakeholders refer to RAM in case of conflict regarding the roles and responsibilities in assignments or duties. RAM helps reduce conflict in projects to a great extent. Using this document, every team member will know their roles and the responsibilities of other team members.

The roles in the RACI matrix are as follows:

  • Responsible: This stakeholder is responsible for completing the task.
  • Accountable: This stakeholder is accountable for the task. They will make decisions and delegate work to the stakeholders who are responsible for completing the task.
  • Consulted: These stakeholders will be consulted on any decisions made about the task.
  • Informed: These stakeholders only require an updated status report on the progress of the task.

Responsibility Assignment Matrix Example

As I said, the RACI chart is the most popular example of RAM.

The table below shows the RAM example using the RACI chart:

Example of Responsibility Assignment Matrix

Some other less-popular responsibility assignment matrix examples are as follows:

  • RASCI Chart: This chart is also known as the “RASCI matrix,” as the letter S is added, which means “supportive.” 
  • DACI Chart: DACI stands for “Driver, Approver, Contributor, and Informed.” 
  • RAPID Chart: RAPID stands for “Recommend, Agree, Perform, Input, and Decide.” 
  • CARS: CARS stands for “Communicate, Approval, Responsible, and Support.” 
  • CLAM: CLAM stands for “Contribute, Lead, Approve, and Monitor.” 

Responsibility Assignment Matrix Template

The table below shows the basic template for the responsibility assignment matrix.

Responsibility Assignment Matrix Template

RAM is a key tool in project management . It helps the project manager assign roles and responsibilities. Additionally, it ensures that the team stays on its path and that no one interferes with each other’s roles. Finally, RAM ensures that every task has responsible and accountable stakeholders assigned to it.

This topic is important from a PMP exam point of view.

what is a responsibility assignment matrix

I am Mohammad Fahad Usmani, B.E. PMP, PMI-RMP. I have been blogging on project management topics since 2011. To date, thousands of professionals have passed the PMP exam using my resources.

PMP Question Bank

This is the most popular Question Bank for the PMP Exam. To date, it has helped over 10,000 PMP aspirants prepare for the exam. 

PMP Training Program

This is a PMI-approved 35 contact hours training program and it is based on the latest exam content outline applicable in 2024.

Similar Posts

agile coach vs scrum master

Agile Coach Vs Scrum Master

Agile Coach and Scrum Master have different roles. However, many professionals confuse the two and/or think they are interchangeable. This blog post will clarify the differences between an Agile Coach Vs Scrum Master. After reading it, I hope you won’t have issues understanding these two roles. Let’s get started. Agile Coach Vs Scrum Master Due…

pmp exam preparation

PMP Exam Preparation: Pass the PMP Exam on Your First Attempt

In today’s blog post, I will explain the PMP exam preparation in detail. If you follow the strategy given in this post, you will be in a better position to pass the PMP exam on your first attempt. Over the last ten years, I have seen many aspirants pass and fail the PMP exam.  Professionals…

Kübler-Ross Model

What is the Kübler-Ross Model (Five Stages of Grief)?

The Kübler-Ross Model (also known as the “Five Stages of Grief” or “DABDA”) is a psychological model which states that people who experience grief go through five stages of emotions: (1) denial, (2) anger, (3) bargaining, (4) depression, and (5) acceptance.  Swiss-American psychiatrist Elisabeth Kübler-Ross introduced this model in her 1969 book, On Death and…

RAG Status

What is RAG Status Reporting in Project Management?

Many project managers report the project status as “Red,” “Amber,” or “Green,” which is commonly known as “RAG status reporting.” RAG status in project management helps the project manager visually share the project status with stakeholders. RAG Reporting is useful in project management. In today’s post, I will explain this tool in detail so you…

Monday Sales CRM Review (2024): Features, Pros & Cons

Monday Sales CRM Review (2024): Features, Pros & Cons

In this blog post, I will discuss Monday Sales CRM and explain how it differs from other available CRM platforms. CRM stands for “Customer Relationship Management,” which helps organizations gain customers, develop relationships, and grow the business. It provides a better way to manage relationships with customers and suppliers by storing customer data, recording service…

CEU Vs PDU

Continuous learning is vital for maintaining competitiveness, staying current with industry trends, and advancing your career.  Two commonly used metrics for tracking professional development are Continuing Education Units (CEUs) and Professional Development Units (PDUs).  Both metrics measure professional growth; they are used in different contexts and industries.  In today’s post,  I will explain the differences,…

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

web analytics

what is a responsibility assignment matrix

How to Make a Responsibility Assignment Matrix: Excel RACI Template

what is a responsibility assignment matrix

What is a responsibility assignment matrix?

How to create a responsibility assignment matrix in excel, free raci template for excel, how to manage raci roles in your teamgantt plan.

A responsibility assignment matrix (RAM) is a tool used in project management to clarify team and stakeholder roles for each project step. It paves the way for smooth collaboration by ensuring everyone knows what they need to do, who they need to talk to, and who has the final say on key decisions and deliverables.

RACI—which stands for Responsible , Accountable , Consulted , Informed —is the most popular framework used for assigning roles and responsibilities on projects. Here’s a quick breakdown of RACI categories in basic terms:

  • Responsible : Who completes the work?
  • Accountable : Who makes decisions? 
  • Consulted : Who provides expertise?
  • Informed : Who needs status updates?

Of course, RACI isn’t the only responsibility assignment matrix out there. These RACI alternatives provide a small sample of other approaches you might come across in project management.

  • RASCI (or RASIC) matrix : This RACI alternative adds one extra role into the responsibility assignment mix. In the RASCI model, the S stands for Supportive . While this role covers anyone who will lend the Responsible person a hand with the work, a Supportive team member isn’t responsible for the outcome.
  • DACI matrix : DACI stands for Driver , Approver , Contributor , Informed and is used to outline decision-making roles and responsibilities for projects. In this framework, the project manager or leader typically serves as the Driver guiding the team to a decision.‍
  • RAPID responsibility matrix : RAPID stands for Recommend , Agree , Perform , Input , Decide and is another decision-making framework used to define authority vs accountability. The Recommend role kicks things off by suggesting an action, while the Decide role has the ultimate say in how things move forward. ‍
  • CARS : CARS stands for Communicate , Approver , Responsible , Support . In this model, Communicate combines RACI’s Consulted and Informed roles into a single assignment. Someone with the Communicate role lends their expertise and needs to be kept up-to-date on progress. The Approver is the main decision-maker who calls the shots.

Lay a clear path to success with a visual plan that’s easy to understand, and keep everyone in sync with flexible workflows and team collaboration.

what is a responsibility assignment matrix

Lots of people use spreadsheets to make a responsibility assignment matrix for their projects, so let’s walk through the basic steps of building one in Excel, using the RACI framework as our model.

Looking for an online solution? See how TeamGantt's RACI feature integrates into your project plan.

1. List project tasks and deliverables in column A

First, make a list of all the work that needs to be done for your project down the left side of your matrix. Enter each project task, milestone, or decision in column A of your Excel worksheet. 

Feel free to group tasks by project phase like we’ve done in the screenshot below. That way, your RACI matrix is easy to scan and read.

Excel RACI Matrix Step 1 - List project tasks and deliverables

2. Add team members or project roles across row 1

Starting with column B, label each column header with the name of a team member and/or project role. 

Include the people who will execute and review work for the project, as well as any subject matter experts or stakeholders you may need to consult or keep in the loop along the way.

Excel RACI Matrix Step 2 - Add project role and team member names

3. Insert a new worksheet for roles and definitions

Click Insert > Insert Sheet from the Home ribbon at the top of your Excel workbook.

Excel RACI Matrix Step 3a - Insert new sheet for roles and definitions

Go to your new worksheet, and list each letter of the RACI acronym in column A. Then enter the corresponding role for each letter in column B. We also included RACI definitions in column C as a handy reference for anyone who might need a refresher.

Excel RACI Matrix Step 3b - Enter roles and definitions

You’ll use this worksheet to populate a drop-down list on the main RACI matrix tab to make it easier to assign roles quickly.

4. Add a drop-down list of roles to your matrix

Now, go back to your main worksheet, and click into the first open cell in your matrix.

On the ribbon, click Data > Data validation to insert a drop-down list with RACI roles.

Excel RACI Matrix Step 4a - Click Data Validation

On the Settings tab, choose List under the Allow menu.

Excel RACI Matrix Step 4b - Select allow list setting

Click into the Source field, then highlight the data range with your options from the RACI Roles & Definitions worksheet you set up in Step 3. We highlighted cells A2-A5 in our example.

Excel RACI Matrix Step 4c - Select data source

Verify your Data validation settings are correct, then hit Enter to add the drop-down list to your selected cell.

Excel RACI Matrix Step 4d - Confirm data validation settings

Copy and paste that cell to apply the drop-down list to other cells in your RACI matrix worksheet.

5. Color-code assignments with conditional formatting

Click Conditional Formatting > New Rule on the Home tab. Select Classic > Format only cells that contain > Specific text > containing . Enter the letter R in the text box, then choose Custom Format , and apply a background color (and any other styles you want). 

Repeat this step for each additional letter in the acronym.

Excel RACI Matrix Step 5 - Color-code responsibility assignments with conditional formatting

6. Assign a RACI value to everyone on every task

You’re almost there! Now go down the list of tasks on your responsibility assignment matrix, and assign a role to every person who will be involved in that project step or deliverable.

Excel RACI Matrix Step 6 - Assign a role to everyone on every task

Want to build a responsibility assignment matrix of your own, but don't want to start from scratch? Download our ready-made Excel template for free. This blank RACI template is fully editable, so you can customize it for any project you manage. 

We added drop-downs for assigning RACI roles more easily and included a RACI chart example tab as reference in case you need a little extra guidance.

Download: RACI matrix template for Excel

Free RACI Template for Excel by TeamGantt

You can easily upload your final matrix to your TeamGantt project . But if you don’t want to worry about outdated spreadsheets that get forgotten once work begins, why not assign RACI roles directly to your plan?

Here’s how to use TeamGantt’s online RACI feature for your next project.

Assigning RACI roles and responsibilities to TeamGantt tasks

  • Open your project, and toggle to the RACI tab. This will display all your project tasks in a list format (rows). On the right side of the matrix, you’ll see a column for each person currently invited to the project with cells for each task in the project. 
  • Click the cell below each person who needs to be assigned a role on a task, and choose one of the RACI options from the drop-down.

Screenshot of TeamGantt's built-in RACI matrix for assigning task responsibilities

Viewing RACI matrix assignments for your project

There are 2 simple ways to view RACI assignments in TeamGantt:

  • From the Gantt tab : If someone is assigned to a task and has a RACI role on that task, the RACI value will appear in parentheses next to that person’s name on the gantt chart. Just be aware that you won’t see RACI assignments for people who haven’t been assigned to a specific task in Gantt view.

Screenshot of RACI roles in a TeamGantt timeline

  • From the RACI tab : To access your project’s full RACI matrix, simply toggle to the RACI tab for that project. You’ll find RACI assignments for every person playing a role—whether or not they’re the one responsible for doing the work.

Screenshot of the RACI tab in a TeamGantt project

Keep teams in sync—and accountable—with TeamGantt

A responsibility assignment matrix is a simple tool that makes projects easier to manage by creating less confusion and more accountability. But you’ve got more than roles and responsibilities to keep straight.

TeamGantt makes it easy to build a project plan your whole team can contribute to and collaborate on. Everything happens online, so you can stay on top of deadlines and monitor progress in real time.

Use our built-in RACI chart to assign roles and keep them visible from project start to finish, so everyone knows how they contribute to success.

Try TeamGantt’s Pro Manager plan free for 7 days!

what is a responsibility assignment matrix

You might be using an unsupported or outdated browser. To get the best possible experience please use the latest version of Chrome, Firefox, Safari, or Microsoft Edge to view this website.

What Is A RACI Chart? How This Project Management Tool Can Boost Your Productivity

Dana Miranda

Updated: Jun 4, 2024, 2:46pm

What Is A RACI Chart? How This Project Management Tool Can Boost Your Productivity

The RACI chart has long been a popular tool amongst project managers around the world. Also referred to as the RACI matrix, it’s used to clarify employee roles and responsibilities for each task, milestone and decision that takes place throughout a project.

The chart is designed to ensure clear communication and smooth workflows across all parts of a team. RACI charts can help prevent that sinking feeling when a major decision-maker comes at the end of a project and complicates things with a large number of changes because they weren’t consulted throughout the project.

Featured Partners

From $8 monthly per user

Zoom, LinkedIn, Adobe, Salesforce and more

monday.com

On monday.com's Website

Yes, for unlimited members

$7 per month

Slack, Microsoft Outlook, HubSpot, Salesforce, Timely, Google Drive and more

ClickUp

On ClickUp's Website

$9.80 per user per month

Salesforce, Adobe, Miro, Netsuite, Quickbooks, SAP

Wrike

On Wrike's Website

Yes, for one user and two editors

$9 per user per month

Google Drive, Slack, Tableau, Miro, Zapier and more

Smartsheet

On Smartsheet's Website

What Is a RACI Chart?

A RACI chart, also called a RACI matrix, is a type of responsibility assignment matrix (RAM) in project management. In practice, it’s a simple spreadsheet or table that lists all stakeholders on a project and their level involvement in each task, denoted with the letters R, A, C or I. Once these roles are defined, assignments can be attributed to the roles and work can begin.

R, A, C, I stands for:

Responsible

Accountable.

Here’s what each designation means:

Responsible designates the task as assigned directly to this person (or group of people). The responsible person is the one who does the work to complete the task or create the deliverable. Every task should have at least one responsible person and could have several.

Responsible parties are typically on the project team and are usually developers or other creators.

The accountable person in the RACI equation delegates and reviews the work involved in a project. Their job is to make sure the responsible person or team knows the expectations of the project and completes work on time. Every task should have only one accountable person and no more.

Accountable parties are typically on the project team, usually in a leadership or management role.

Consulted people provide input and feedback on the work being done in a project. They have a stake in the outcomes of a project because it could affect their current or future work.

Project managers and teams should consult these stakeholders ahead of starting a task to get input on their needs, and again throughout the work and at the completion of a task to get feedback on the outcome.

Not every task or milestone needs a consulted party, but the project manager should consider all possible stakeholders when creating the RACI chart and include as many consulted parties as is appropriate. You should limit this to only necessary input, however. For example, one consulted party per affected team is generally considered best practice to avoid clogging the process with too much input.

Consulted parties may be individuals on the project team who aren’t working on a given task but whose work will be affected by the outcome. They’re also often teammates outside of the project team—even in different departments—whose work will be affected by the outcomes of the project.

Informed folks need to be looped into the progress of a project but not consulted or overwhelmed with the details of every task. They need to know what’s going on because it could affect their work, but they’re not decision makers in the process.

Informed parties are usually outside of the project team and often in different departments. They might include heads or directors of affected teams and senior leadership in a company.

When Should You Use a RACI Matrix?

The framework of a RACI chart is useful for almost any project, although some teams might find it more useful than others

For example, I know in creating this article that I’m the responsible party, because I’m doing the work of writing. My editor is accountable for assigning and reviewing the work. And they likely have consulted and informed others around them, such as a managing editor and an SEO specialist.

But this project is fairly simple. It only takes a few steps and includes a handful of stakeholders. A formal RACI chart comes in handy for complex and long-lasting projects that include lots of stakeholders, tasks and milestones, especially if work is overlapping.

For example, a company’s website redesign would require design, copy and development teams to work on tasks concurrently. Each task would affect work in sales, marketing, finance and business development. Structural changes, timelines and major costs would require input and approval from senior management.

Needs are easily overlooked and requirements dropped in such complex projects.

A project manager typically creates a RACI chart to avoid missing those important details and ensure clear communication throughout the project.

Using RACI with Other Project Management Methodologies

Agile is a very popular type of project management, especially for tech workers. While RACI is applicable to agile project management, schools of thought vary on whether it is necessary for an agile context.

Additionally, the Scrum and Scrumban project management methodologies build project ownership (accountability) into their framework and are designed to facilitate regular communication among project teams and outside stakeholders. That makes a RACI chart seem redundant for this method and possibly a poor use of a project manager’s time.

However, additional communication and clarification—in a systematic fashion—tend to be more of a benefit than a drawback for any project, so some SCRUM project managers find RACI useful for clarifying roles for individual projects or their overall process.

Example RACI Chart (and How To Use It)

what is a responsibility assignment matrix

To create a RACI chart, list all of a project’s tasks down the left-hand column and stakeholders across the top row. For each task, enter an R, A, C or I to assign a level of involvement for each stakeholder in each task.

For example, in the matrix above:

  • The senior analyst is responsible for completing the work in the econometric model.
  • The SVP finance is accountable for that task—they assign it to the senior analyst and review the work.
  • The team will consult the SEO lead for input before and feedback after the task.
  • The team will inform the project manager, head of design, sales director and senior management of the project’s progress.

Color coding tasks can be useful to see at a glance whether any team member is responsible for too many tasks within a project and to make sure you’ve assigned at least one Responsible and one Accountable party for each task.

Breaking the chart down by project phases also lets you see how many tasks anyone is responsible for within a certain timeframe, which can help distribute work evenly and avoid overwhelm.

Pros and Cons of RACI

From a project management perspective, things like more organization and clearer communication are generally better, so the benefits of using a RACI chart on a project far outweigh the drawbacks in most cases. With that in mind, teams should be cognizant of the initial time investment of creating a RACI chart and the rigidity of the roles.

  • Maintain clear and open communication with all stakeholders.
  • Avoid overwhelming team members with tasks or unnecessary information.
  • Avoid “too many cooks” offering input on any task.
  • Help stakeholders prepare for a project’s future impact on their work.
  • You might spend time unnecessarily creating the chart for simple projects.
  • Roles are rigid and might not fully illustrate a team member’s stake in a project.

You might see additional drawbacks using a RACI chart for your project if your team succumbs to some common pitfalls, including:

  • Stakeholders will be confused if they don’t understand the differences among the terms, especially Responsible versus Accountable and Consulted versus Informed.
  • It’s a formality and a waste of time if no one references it after approval.

RACI Matrix Alternatives

Some teams find the roles designated through the RACI model aren’t the right fit for their projects. You might find better options in these less common alternatives—all use a chart with tasks and stakeholders like RACI, but they use different terms in an attempt to more clearly define roles.

This alternative to RACI uses the RACI model plus S for Supportive. This is someone who participates in doing the work of a task by supporting the responsible parties.

This model designates stakeholders as:

  • Communicate: These are the consulted and informed parties.
  • Approve: This is the decision maker.
  • Responsible: This person does the work.
  • Support: These parties support the responsible person in doing the work.

This model simplifies CARS with just the Responsible, Approve and Support roles. It eliminates communication outside the project team, which would need to be accounted for another way in the project management method.

This model includes these roles similar to RACI:

  • Drivers: The people who do the work.
  • Approvers: The decision makers.
  • Contributor: People who are consulted on the task.
  • Informed: People who are informed of the project’s progress.

In this model, stakeholders are assigned these actions:

  • Contribute: People who are consulted and who do the work.
  • Lead: People who delegate work and manage a task.
  • Approve: Decision makers.
  • Monitor: People who are kept in the loop on a project’s progress.

Bottom Line

Projects can be complex, confusing and chaotic. That’s why we rely on team members with the project management skills necessary to reign in the disparate pieces of a project and focus directly on keeping them organized as a project progresses.

A RACI chart is one tool that helps project managers keep a project on track.

By listing all stakeholders and assigning a level of involvement for each task, the chart helps teams communicate clearly and keep the right people in the loop.

  • Best Project Management Software
  • Best Construction Project Management Software
  • Best Project Portfolio Management Software
  • Best Gantt Chart Software
  • Best Task Management Software
  • Best Free Project Management Software
  • Best Enterprise Project Management Software
  • Best Kanban Software
  • Best Scrum Software
  • Asana Review
  • Trello Review
  • monday.com Review
  • Smartsheet Review
  • Wrike Review
  • Todoist Review
  • Basecamp Review
  • Confluence Review
  • Airtable Review
  • ClickUp Review
  • Monday vs. Asana
  • Clickup vs. Asana
  • Asana vs. Trello
  • Asana vs. Jira
  • Trello vs. Jira
  • Monday vs. Trello
  • Clickup vs. Trello
  • Asana vs. Wrike
  • What Is Project Management
  • Project Management Methodologies
  • 10 Essential Project Management Skills
  • SMART Goals: Ultimate Guide
  • What is a Gantt Chart?
  • What is a Kanban Board?
  • What is Gap Analysis?
  • Work Breakdown Structure Guide
  • Agile vs. Waterfall Methodology
  • What is a Stakeholder Analysis
  • What Is An OKR?

What Is SNMP? Simple Network Management Protocol Explained

What Is SNMP? Simple Network Management Protocol Explained

AJ Dellinger

What Is A Single-Member LLC? Definition, Pros And Cons

Evan Tarver

What Is Penetration Testing? Definition & Best Practices

Juliana Kenny

What Is Network Access Control (NAC)?

Leeron Hoory

What Is Network Segmentation?

How To Start A Business In Louisiana (2024 Guide)

How To Start A Business In Louisiana (2024 Guide)

Jacqueline Nguyen, Esq.

Dana Miranda is a Certified Educator in Personal Finance® who's been writing about money management and small business operations for more than a decade. She writes the newsletter Healthy Rich about how capitalism impacts the ways we think, teach and talk about money. She's the author of YOU DON'T NEED A BUDGET (Little, Brown Spark, 2024).

With over a decade of editorial experience, Rob Watts breaks down complex topics for small businesses that want to grow and succeed. His work has been featured in outlets such as Keypoint Intelligence, FitSmallBusiness and PCMag.

Project.co

Responsibility Assignment Matrix (RACI Matrix) Explained

Approx reading time:

Last updated 11th April 2024

There’s an old saying that ‘If everyone’s responsible, nobody’s responsible.’ And in project management, it often rings true.

When people don’t know exactly what they – and their colleagues – are responsible for, it’s easy for things to get missed, ignored, or left for others to deal with.

This is especially true nowadays, with projects more complex – and teams more distributed – than ever.

And it’s a situation that leads to confusion, frustration, and, potentially, project failure .

One way to mitigate this is the responsibility assignment matrix – sometimes called the RACI matrix.

In this post we’ll outline the core principles of the RACI Matrix – and explain why it may be a good idea for project managers to put in place for their projects!

What is a RACI matrix?

A RACI matrix is an essential project management tool used to define roles and responsibilities for a project or project task. It’s about defining who’s responsible for projects or tasks, and what level of input is expected of them.

These are the four categories of involvement in a project, and each individual or team involved in the project is assigned one of these project roles. 

Let’s first dig into what they mean…

Responsible

The Responsible category is for a person or team who is actively involved in completing a task or project. To put it crudely, they’re the ones who are actually ‘doing the work.’

Accountable

The Accountable category is for the person or team who’s ultimately responsible for the success or failure of the project, task or deliverable. They might not be the ones ‘doing’ the work, but they are the ones who are ultimately accountable for the outcome. 

Consulted

The Consulted category is for teams or people who need to be consulted for their expertise or input along the way. They may not be directly involved in the work, but their input is important. For example – these people might be required to give feedback and sign off, or provide technical advice.

Informed

And the Informed category is for people who need to be kept informed of progress. They may provide input on a task or project, but more likely, they just require up-to-date info to understand where things are up to.

By clearly defining roles and responsibilities for a project using a RACI matrix, it’s easier to monitor progress and ensure successful completion. 

It also helps to eliminate misunderstandings about who is responsible for what by enshrining this in a clear, visual way.

How to create a RACI matrix

Creating a RACI matrix is easy to do. The matrix consists of two main elements – a table and a list of tasks, roles and responsibilities for the project or task.

The table is made up of columns for each individual involved in the project, and rows for each task or activity that needs to be completed. Each cell in the table will indicate the role for that person in relation to that particular task. The list should include a description of each task or activity, as well as the roles and responsibilities for each individual involved.

Let’s look at a classic project and consider how those categories would come into effect using the RACI model.

In this example we’ll consider a typical, run-of-the-mill web design project. So we start by adding a column for every person or team involved – we’ll go with client, project manager, web designer, graphic designer, front-end developer, back-end developer, content writers/editors/strategists and a QA team.

Then, down the left-hand column, we list the stages or tasks involved in that project. We’ll keep things broad and go with briefing and project outline, design, look and feel, user experience, front-end user interface, back end functionality and website content

Again, this is pretty broad, but you could also make it incredibly granular, highlighting every single task and every single person – and, actually, the RACI matrix is often at its best when done in this more detailed way.

Then, to complete our RACI matrix, we need to go through each empty box in our chart and fill it out with one of our four letters to denote whether that person or team is Responsible, Accountable, Consulted or Informed.

RACI matrix example

To further illustrate the idea, let’s look at a different example – designing and executing a content marketing strategy.

In this example you’ll notice that we have some individuals marked as “A&R” – this means they’re both accountable AND responsible. In other words, they’re tasked with doing the work – AND accountable for the results – which demonstrates how, sometimes, people can occupy more than one category in the matrix.

RACI matrix example

The beauty of this model is that you can read it in a couple of different ways.

You can view it row by row and work out who has what level of responsibility for a particular task.

Or you can use the columns to work out the requirements of a person or team across a whole project. In theory, you could pick out your role, then get a clear overview of all your responsibilities by simply working your way down the list.

Your RACI Matrix x Project.co

RACI charts are a key part of the project management process – particularly for complex projects – and can be managed with project management software like Project.co . 

Start by creating your project. Every project can be customised to include the tools you need.

what is a responsibility assignment matrix

Next, invite your project team – this can be made up of internal team members, client team members, and even freelancers.

what is a responsibility assignment matrix

The Project Notes section is a great place to leave important info that’s relevant to the whole project. This is a good place to store your RACI matrix. 

Project.co RACI matrix

You can also use the Embed tool to embed documents such as Google Sheets so they’re available from within your project to everyone involved.

Project.co embed tool

You can also include important RACI chart info from within the notes section of each task, as well as attaching tasks to individual people, dates and other important info.

Simply create the tasks you need to complete for your project and assign the responsible person or people to them. 

what is a responsibility assignment matrix

Final thoughts

You don’t have to be a business analyst to create a RACI chart and use this powerful method to make your projects more streamlined, simple and efficient.

The bottom line is that a RACI matrix ensures every team member knows what’s expected of them – who’s accountable, who’s doing the work, who needs to be consulted, and who needs to be kept up to date.

And if you’re looking to take your project management game to the next level – sign up to Project.co today and get started for free!

Written by <a href="https://www.project.co/author/samanthaferguson/" target="_self">Samantha Ferguson</a>

Written by Samantha Ferguson

⭐️ All your work in one place

🗓 Never miss a deadline

🗂 Never lose a file

🏅 Simple for your clients

⚡️ Powerful for your team

Create your account

Create your account and experience the magic of having all your information and communication in one place. Never miss a deadline, have a happier team and happier customers.

Organizational Structure

What is a Responsibility Assignment Matrix

Last updated: Feb 15, 2023

Table of contents

What is a RAM matrix used for?

How to make a ram or raci chart.

Learn what a Responsibility Assignment Matrix is and how to use one to make all your upcoming projects run smoothly.

Credit: track5/Getty Images

A Responsibility Assignment Matrix (RAM), sometimes known as a RACI chart, is a tool used in project management to keep track of all responsibilities assigned to cross-functional teams on a specific task or assignment.

It’s known as a RACI chart because its acronym names the four key roles displayed in the matrix:

  • Responsible: Who is the person responsible for completing a task or making a decision?
  • Accountable: Who is accountable for the completion of the project overall and will sign off on deliverables and decisions?
  • Consulted: Who needs to be consulted to provide input on a particular task or item?
  • Informed: Who needs to be kept informed of project progress or completion?

A typical RAM template looks like this:

| Task | Annabelle (PM) | Jack (Technical Lead) | Dory (Technical Team Member) | | ---------- | ---------- | ---------- | ---------- | | Task 1 | A | I | R | | Task 2 | R | C | I | | Task 3 | C | R | C | | Task 4 | A | R/I | R |

The RAM matrix is used to document every task, item and decision involved in a project completion process. By keeping everything logged all in one place, a RAM matrix is an invaluable tool to any project manager or company leader for a few reasons.

  • Defines clear roles and responsibilities

There is nothing worse than a project being slowed down or stalled because of confusion over who was supposed to do what. In a RAM, every person or team involved can check to see which task or item.

  • Streamlines communication

Sometimes explaining directions in person or over a workplace communication tool can get confusing or be interpreted the wrong way. Even worse, one instance of miscommunication can tank an entire project or jeopardize a relationship with a client.

With a RAM, project managers don’t have to waste time directing questions to the responsible stakeholder in charge of making a decision. The chart informs everyone involved exactly who they can go to for answers, cutting out repetitive conversations and notifying the right people at the right time.

  • Distributes workloads evenly

No one ever wants to be the one in the group project that has to do everything. Team members with a higher workload are at a greater risk for burnout. A great benefit of a RAM is that everyone can see how the workload for a certain project is distributed. It’s also a great way to be transparent within workflows.

Don’t let the random letters confuse you. Building a RACI chart is surprisingly simple. It can also easily be tweaked to fit your organization and your particular project. According to the work management platform Wrike , here are four steps to follow when building a responsibility assignment matrix:

  • Identify all project roles

Start out with a list of everyone involved in a project, including every team, team member, manager and stakeholder.

  • Identify all project tasks

Then make a list of all the tasks and items needed to get a project done. These can include deliverables, activities, milestones and decisions.

  • Create a chart with a column for each role and a row for each task

In a spreadsheet—or any other tool you’d like—create a simple table by listing each person or role in the columns and each task or deliverable in the rows.

To get the most out of your RACI chart, try to make the roles as personal as possible. For example, instead of naming a role “technical lead,” try to use names, like “Jack.” This will give every person involved a sense of ownership, while also streamlining communication even further.

  • Assign “R,” “A,” “C” or “I” to each person involved

Once you have written out the names of each person and task, now comes the important part of assigning RACI to each person involved. Identify who is responsible, who is accountable, who needs to be consulted and who needs to be informed for every task in the project. A role can have more than one letter, but simplify it as much as you can. Bonus step: Add a color to each letter to make the roles stand out even more.

That’s it! You now have made a successful RACI chart. Review with your team and all stakeholders before you initiate a plan, and you are officially on your way to more effective project management.

Create your own free org chart today!

Show off your great team with a public org chart. Build a culture of recognition, get more exposure, attract new customers, and highlight existing talent to attract more great talent. Click here to get started for free today.

what is a responsibility assignment matrix

The ORG helps you hire great candidates

Free to use – try today

The Best Organizational Chart Software of 2024

19 min read

What is an Org Chart?

Which org structure fits you, matrix organizational structure.

Program Management

Definition: A Responsibility Assignment Matrix (RAM) describes the role and responsibilities of various people and/or organizations in completing specific tasks for a project.

Responsible, Accountable, Consulted, and Informed (RACI) Matrix

Benefit of utilizing a responsibility assignment matrix (ram), responsibility assignment matrix (ram) goal in project management, responsibility assignment matrix (ram) tutorial, responsibility assignment matrix (ram) standard format, responsibility assignment matrix (ram) template, template: responsibility assignment matrix (ram) (excel), 6 steps to developing a responsibility assignment matrix (ram), developing responsibility assignment matrix (ram) matrix best practices, responsibility assignment matrix (ram) lessons learned, difference between a responsibility assignment matrix (rma) and a responsible, accountable, consulted, and informed (raci) matrix, acqlinks and references:, leave a reply.

banner-in1

  • Project Management

Responsibility Assignment Matrix: Template, Example & Benefits

Home Blog Project Management Responsibility Assignment Matrix: Template, Example & Benefits

Play icon

Your team is the most crucial resource in completing a job. They must adhere to the project's schedule and budget. Controlling the project requires everyone involved to understand their roles and duties when carrying out tasks and accomplishing project objectives. How can all the participants in a project be coordinated so that they are aware of what they are doing and do not prevent others from carrying out their tasks? An assignment of responsibility matrix can be useful.

Your project will have a productive crew thanks to an assignment matrix. You can take an online PMP course to learn the details included in RAM, Responsibility Assignment Matrix in project management, and Responsibility Assignment Matrix example, to advance your career.

What is a Responsibility Assignment Matrix in Project Management?

So, what is the responsibility assignment matrix?  A Responsibility Assignment Matrix (RAM), sometimes referred to as a RACI chart or RACI matrix, in project management identifies all relevant stakeholders and specifies roles for cross-functional teams and their level of involvement in a project. Each letter in the acronym RACI, which stands for Responsible, Accountable, Consulted, and Informed, refers to a different team member in the Responsibility Assignment Matrix in Project Management.

1. Responsible

The team member that oversees finishing the assignment is the person responsible for the RAM, Responsibility Assignment Matrix. The person in charge may be tasked with gathering all the visual and data assets required to put together the presentation if your team is working on a pitch deck (Responsible for executing the task).

2. Accountable

The responsible team member distributes the tasks to the other team members and ensures that they are finished accurately and on time. This team member oversees making sure the project is completed on schedule and that the tasks are fairly distributed among the accountable parties (Has governing & directing authority).

3. Consulted

A responsible party in Responsibility Assignment Matrix Project Management may frequently need to consult an expert, who serves as the consulted person, to finish certain responsibilities. A professional analysis of the consulted party is required when someone is tasked with gathering marketing statistics for a presentation. They also need to ensure that the data the responsible party is required to submit is accurate (Provide insights, analysis or expert judgment).

4. Informed

The informed party needs to be aware of when the major project components are finished even though they may not be directly involved in all the steps to ensure that everything is running smoothly. The informed team member must be aware of any delays or stalls in the project as they must complete their tasks (Updated with project information and outcome).

Responsibility Assignment Matrix in Project Management

Responsibility Assignment Matrix (RAM) Goal in Project Management

The goal of the Responsibility Assignment Matrix (RAM) is to clearly define roles and responsibilities of everyone on a project team. This ensures that everyone understands their role and how it fits into the bigger picture. RAM also allows for quick identification of whom to contact when an issue arises. It might also be applied within a working group to establish authority levels, roles, and duties for tasks.

The matrix format displays each person's associated actions and each person's associated people. To avoid confusion, this makes sure that there is only one person responsible for each task. It is also important to outline the dates and reminders for each participant, so that they are aware of their deliverables/plans to fulfill the deliverables. The best Project Management Certification programs online will teach you how to make efficient decisions and effectively use RAM.

How to Create a Responsibility Assignment Matrix?

A Responsibility Assignment Matrix (RAM) is a table that shows the tasks needed to be completed as part of a project, who is responsible for each task, and when the task needs to be completed. Making a matrix to distribute responsibilities is not as challenging as getting everyone on board with their respective jobs and responsibilities.

You should therefore involve your staff in the process, receive their feedback, and eventually secure their buy-in without expending excessive time and effort on it. You will have a successful responsibility assignment if you follow these instructions to ensure that everyone is on the same page. 

  • List every person involved in the project, including the team, stakeholders, and everyone in between.
  •  List each project deliverable that you can think of. To make sure you do not overlook any, use a work breakdown framework.  
  •  To discuss how to carry out the tasks and produce the deliverables, meet with the team members. The duty and authority of the team for each assignment must be discussed.
  •  Utilizing a table with the project tasks specified in the left-hand column, create a Responsibility Assignment Matrix. Print the names of everyone involved in the project across the top.
  • Assign whether a project team member is liable, accountable, consulted, or informed where the tasks meet them.  
  •  Share the completed Responsibility Assignment Matrix Template Word with the project team and stakeholders. If necessary, conduct a meeting to ensure that everyone is aware of their responsibilities for the project. Print a copy, and if you are working in a common location, post it.

Developing Responsibility Assignment Matrix (RAM) Best Practices

The best practices for developing a Responsibility Assignment Matrix (RAM) will vary depending on the specific project and organization. However, some tips on how to develop a RAM matrix effectively include the following:

  • Define the project scope and objectives clearly, so that all stakeholders understand the parameters of the project and what is expected to be accomplished.
  • Assign clear roles and responsibilities to individuals and teams so that everyone knows who is responsible for what aspect of the project.
  • Make sure that the Responsibility Assignment Matrix PMP is kept up to date as the project progresses so that everyone is aware of any changes in roles and responsibilities.
  • Use the RAM matrix as a tool to help identify potential risks and issues related to the project so that they can be addressed early on.
  • One stakeholder leads a task.
  • The lesser number of people are accountable, the better.
  • Act efficiently with meetings.
  • Continuous communication.
  • Stakeholder agreement on final RAM.

Responsibility Assignment Matrix Examples and Templates

  • Responsibility Assignment Matrix (RACI) 
  • RACI-VS (Responsible, Accountable, Consulted, Informed- “V”erification and “S”ign off)
  • RASCI (Responsible, Accountable, Support, Consulted, Informed)
  • RAC (Responsible, Accountable, Consulted)
  • ARCI (Accountable, Responsible, Consulted, Informed)
  • RATSI (Responsibility, Authority, Task, Support, Informed)
  • PACSI (Perform, Accountable, Control, Suggest, Informed)
  • RACIQ (Responsible, Accountable, Consulted, Informed, Quality Review)
  • DACI (Driver, Approver, Contributors, Informed)
  • CAIRO (Consulted, Accountable, Informed, Responsible, Omitted)

sample responsible assignment matrix - RACI

Downloadable Responsibility Assignment Matrix Template Excel

Download the Responsibility Assignment Matrix Template (xlsx) here!

This Responsibility Assignment Matrix template is available for free in both Excel and OpenDocument Spreadsheet formats. The template can be completely modified using Microsoft Excel and adjusted to meet the needs of your project. To make it simple to understand what is required of each worker on each task, the template employs conditional formatting to change the color of each cell.

Download a Printable Responsibility Assignment Matrix PDF

Download the Responsibility Assignment Matrix Template (PDF) here!

If you intend to design a Responsibility Assignment Matrix (RAM), you may require samples and templates to use as a guide, regardless of whether you are managing an event, a construction project, or a restaurant. Some of the templates are-

  • Responsibility Assignment Matrix Sample
  • Responsibility Assignment Matrix for Construction Project Template
  • Basic Responsibility Assignment Matrix Sample
  • Responsibility Assignment Matrix in PDF

Benefits of Responsibility Assignment Matrix

There are many benefits of the Responsibility Assignment Matrix. One benefit is that it helps to ensure that everyone on a project team understands their roles and responsibilities. This can help to prevent misunderstandings and conflict between team members. Another benefit of using RAM is that it can help to improve communication between team members.

By clearly defining roles and responsibilities, team members will know whom to go to for specific information or tasks. This can help to avoid confusion and delays. Lastly, RAM can help to improve project management by providing a clear overview of who is responsible for what. This can help project managers to identify potential problems or areas where there may be a lack of resources.

Top Cities where Knowledgehut Conduct Project Management Certification Training Course Online










Unlock your potential as a Scrum Master with our game-changing certified scrum master course . Acquire the skills, knowledge, and confidence to effectively lead agile teams. Join us now and pave your way to success!

A Responsibility Assignment Matrix (RAM) is a tool used to identify and define the roles and responsibilities of individuals and groups within an organization. It is a means of clarifying who is responsible for what and ensuring that everyone understands their roles and responsibilities. RAM can be used to create accountability and ownership for tasks and projects, and to identify potential areas of conflict.

It is a valuable tool for effective project management and can help to ensure that everyone involved in a project is aware of their roles and responsibilities. It can also help to identify potential areas of conflict and ensure that tasks are properly assigned. The KnowledgeHut online PMP course will give you an insight into the Responsibility Assignment Matrix and can be a helpful tool for any project manager.

Frequently Asked Questions (FAQs)

1. what is included in a responsibility assignment matrix.

A Responsibility Assignment Matrix (RAM) is a tool used to help define and assign roles and responsibilities for a project or process. The matrix typically includes a list of tasks or deliverables and the people or groups responsible for each. 

2. What can a Responsibility Assignment Matrix (RAM) eliminate?

RAM eliminates ambiguity and confusion over who is responsible for what on a project. It also provides a clear overview of who is responsible for each task, making it easier to hold team members accountable.

3. What does a Responsibility Assignment Matrix not show?

The duty assignment matrix links resources to the tasks or work packages they must do, but it does not indicate when they will be required to do their work.

Profile

Kevin D.Davis

Kevin D. Davis is a seasoned and results-driven Program/Project Management Professional with a Master's Certificate in Advanced Project Management. With expertise in leading multi-million dollar projects, strategic planning, and sales operations, Kevin excels in maximizing solutions and building business cases. He possesses a deep understanding of methodologies such as PMBOK, Lean Six Sigma, and TQM to achieve business/technology alignment. With over 100 instructional training sessions and extensive experience as a PMP Exam Prep Instructor at KnowledgeHut, Kevin has a proven track record in project management training and consulting. His expertise has helped in driving successful project outcomes and fostering organizational growth.

Avail your free 1:1 mentorship session.

Something went wrong

Upcoming Project Management Batches & Dates

NameDateFeeKnow more

Course advisor icon

PMP Certification & Project Management Training Courses

The Responsibility Assignment Matrix - RAM

Yad Senapathy

Published: December 21, 2022

Updated: June 11, 2024

The responsibility assignment matrix, also known as RAM, is a helpful tool used in project management to identify and clarify the roles and responsibilities of each team member. It ensures that every team member understands their duties and how they fit into the project plan. Using RAM in project management helps define roles and responsibilities within a project team and avoids confusion or overlap. Besides these things, the Responsibility Assignment Matrix also helps improve communication and coordination within the team, leading to a more successful project outcome.

What is RAM in project management?

A RAM consists of a grid with four columns: responsible, accountable, consulted, and informed also known as a RACI chart. Each row on the grid represents a specific task or activity within the project, and each column represents a role or responsibility. To help you understand these four columns, we have explained them below.

Responsible

This column represents the person or team responsible for completing the task. They are the ones who will do the work.

Accountable

This column represents the person or team ultimately accountable for completing the task. They may not be doing the work themselves, but they are responsible for ensuring it gets done.

This column represents the people or teams who need to be consulted or informed about the task before it is completed. They may have input or expertise that can help in completing the task effectively.

This column represents the people or teams who need to be informed about the task once it is completed. They may not have direct involvement in the task, but they need to be kept in the loop for various reasons.

Things to Consider When Creating a RAM or a RACI chart

If you’re creating a RAM, here are a few key considerations to keep in mind.

  • Ensure the roles and responsibilities are clearly defined: It is vital that everyone on the team understands their specific duties and how they fit into the project plan. If there is any confusion or uncertainty, it can lead to delays or mistakes.
  • Ensure accountability: The person or team in the accountable column should be identified, as they are ultimately responsible for ensuring that the task is completed successfully.
  • Be mindful of overlap: Avoiding overlap or duplication of responsibilities within the team is important. If multiple people or teams are responsible for the same task, it can lead to confusion and potentially create unnecessary bottlenecks.
  • Use it as a living document: A RAM is not a static document, as it should be updated with the change in roles and responsibilities and the progress made in the project. Make sure to regularly review and revise the RAM as needed to reflect the project’s current state accurately.

Example of Responsibility Assignment Matrix (RAM)

Following is an example of a responsibility assignment matrix for a new product launch project.

Task Responsible Accountable Consulted Informed
Conduct market research Marketing team Product manager Sales team Executive team
Design product packaging Design team Product manager Marketing team Executive team
Source materials for production Procurement team Product manager Design team Executive team
Set up production line Operations team Product manager Procurement team Executive team
Create marketing campaign Marketing team Product manager Sales team Executive team

In this example, the product manager is the one who is ultimately accountable for the success of the project, while the various teams are responsible for completing specific tasks. The marketing, design, procurement, and operations teams are all responsible for their respective tasks, and they are also consulted or informed as needed by other teams. The executive team is kept informed of the project’s progress.

To sum it up, the responsibility assignment matrix RAM also known as a RACI chart is a valuable tool for any project manager to have in their toolkit. It helps to clearly define roles and responsibilities within a team, which ultimately leads to a more successful outcome for any project.

yad senapathy

Yad is not just the leader of the Project Management Training Institute (PMTI). He helped to write significant portions of the project management standards worldwide. He is helping PMI right now in reviewing, directing, and leading the development of the 7th edition of the PMBOK ® Guide to incorporate the most monumental changes to project management standards in 35 years. He shares his wisdom with readers via the PMTI blog.

PMP Course Locations

East coast pmp courses.

  • Washington DC
  • Tysons Corner, VA
  • Fairfax, VA
  • Alexandria, VA
  • Manassas, VA
  • Columbia, MD
  • Baltimore, MD
  • Rockville, MD
  • Richmond, VA
  • New York, NY
  • Parsippany, NJ
  • Princeton, NJ
  • Philadelphia, PA
  • Pittsburgh, PA
  • Hartford, CT

South East PMP Courses

  • Atlanta, GA
  • Huntsville, AL
  • Charlotte, NC
  • Raleigh, NC
  • Charleston, SC
  • Orlando, FL
  • Jacksonville, FL
  • Fort Lauderdale, FL

Mid West PMP Courses

  • Detroit, MI
  • Chicago, IL
  • Madison, WI
  • Milwaukee, WI
  • Minneapolis, MN
  • St. Louis, MO
  • Columbus, OH
  • Cincinnati, OH
  • Cleveland, OH
  • Kansas City, MO
  • Indianapolis, IN
  • Louisville, KY

South West & West Coast PMP Courses

  • Houston, TX
  • Albuquerque, NM
  • Phoenix, AZ
  • San Antonio, TX
  • Anaheim, CA
  • Los Angeles, CA
  • San Jose, CA
  • Sacramento, CA
  • San Diego, CA
  • San Francisco, CA
  • Portland, OR
  • Seattle, WA

This website uses 3rd party cookies to ensure you get the best experience on our website.

language-selector

  • 1.  Project Management Basics
  • 2.  Project Management Methodologies
  • 3.  Project Management Life Cycle
  • 4.  Best Project Management Software
  • 5.  Team Collaboration Tips
  • 6.  Agile Methodology Basics
  • 7.  Agile Project Management Tools & Techniques
  • 8.  Project Management Frameworks
  • 9.  Resources
  • 10.  Glossary
  • Advanced Terminology
  • Methodologies
  • PM Software Features
  • Basic Terminology
  • Professional Development
  • Agile Project Management
  • Project Management %09guide

What is a Responsibility Assignment Matrix (RAM) in Project Management?

Artem Gurnov

Introduction to Responsibility Assignment Matrix (RAM)

Project management is a complex process that involves multiple stakeholders, tasks, and resources. To ensure the success of a project, it is crucial to assign clear roles and responsibilities to team members and accurately define their tasks. 

One tool that can help project managers achieve this goal is the Responsibility Assignment Matrix (RAM). In this article, we will explore the definition and benefits of RAM, as well as some examples.

If you’re looking for a RAM template that will help you assign roles and clarify responsibilities, Wrike has a customizable template ready to go.

What is a Responsibility Assignment Matrix (RAM) in project management?

A responsibility assignment matrix (RAM) in project management, also known as a RACI chart or RACI matrix, details all the necessary stakeholders and clarifies responsibilities amongst cross-functional teams and their involvement level in a project. RACI stands for Responsible, Accountable, Consulted, and Informed and each letter corresponds to a team member.

A RAM in project management should be referred to by all parties throughout a project because it helps plan an individual’s roles and responsibilities before work begins. A RACI matrix ensures all stakeholders know who is responsible for completing a task or getting feedback on deliverables.

The four roles are broken down as follows:

  • Responsible: The person(s) completing the task
  • Accountable: The team member coordinating the actions, making decisions, and delegating to those responsible for the task
  • Consulted: The person(s) who will be communicated with regarding decisions and tasks
  • Informed: The person(s) who will be updated during the project and upon completion

Read more about RACI here . 

Identify and visualize roles seamlessly with Wrike

Responsibility assignment matrix example.

A common RAM   template looks like the example below. Notice how all stakeholders can have more than one role:

what is a responsibility assignment matrix

Responsibility Assignment Matrix template

Below you can see a powerful RAM template . The chart helps with visualizing roles and workload clearly. Therefore, project managers and team members follow the progress easily and stay on track.

what is a responsibility assignment matrix

Clarify roles with Wrike

In conclusion, RAM is a useful tool for any project manager who wants to ensure their team is clear on their responsibilities. It helps to establish a structured approach to project management, allowing for better communication, accountability, and ultimately, project success.

Using Wrike’s pre-built template, you can define the roles of each team member so everybody is on the same page. The template will also help you balance your workload and create complete transparency on your team structure.

What is a RACI Chart?

what is a responsibility assignment matrix

Artem Gurnov

Artem is a Director of Account Development at Wrike. He previously held the role of Project Manager, overseeing a team of customer success managers (CSMs). Over the years of building teams and scaling business processes, he has successfully deployed multiple projects, from automating client outreach to setting up work prioritization tools for sales reps and CSMs.

IMAGES

  1. Responsibility assignment matrix

    what is a responsibility assignment matrix

  2. What Is a Responsibility Assignment Matrix (RAM)?

    what is a responsibility assignment matrix

  3. Responsibility assignment matrix

    what is a responsibility assignment matrix

  4. Responsibility Assignment Matrix Template

    what is a responsibility assignment matrix

  5. Responsibility Assignment Matrix

    what is a responsibility assignment matrix

  6. understanding responsibility assignment matrix raci matrix

    what is a responsibility assignment matrix

VIDEO

  1. PMP® Exam Prep: Foyezur's Crack on RACI Chart

  2. Fundamentals of Information Systems -Part 3- Process and RACI with examples

  3. Episode 11: What's the Difference Between a RAM vs RACI

  4. Responsibility Assignment and Work Authorization

  5. Project Scope Management: Work Breakdown Structure & Responsibility Assignment Matrix

  6. RACI Chart Creation

COMMENTS

  1. What Is A Responsibility Assignment Matrix (RAM)? Everything You Need

    The responsibility assignment matrix is a project management style with four main roles: responsible, accountable, consulted and informed (this is also referred to as a RACI matrix).

  2. How to Make a Responsibility Assignment Matrix ...

    Draft the responsibility assignment matrix using a table with the project tasks listed on the left-hand column. Across the top add the name of everyone in the project. Where the tasks meet the project team member, assign whether they're responsible, accountable, consulted or informed. When completed, share the responsibility assignment matrix ...

  3. RACI Matrix: Responsibility Assignment Matrix Guide for 2024

    RACI is a project management acronym for the different responsibility types within a project: Responsible, Accountable, Consulted, and Informed. The RACI matrix clarifies the roles named individuals or groups will play in the successful delivery of the project. Accurate RACI matrices can help ensure a project's success before it even begins.

  4. Responsibility assignment matrix

    Responsibility assignment matrix. In business and project management, a responsibility assignment matrix[ 1] ( RAM ), also known as RACI matrix[ 2] ( / ˈreɪsi /) or linear responsibility chart[ 3] ( LRC ), is a model that describes the participation by various roles in completing tasks or deliverables [ 4] for a project or business process.

  5. What Is a Responsibility Assignment Matrix (RAM)?

    Introduction to Responsibility Assignment Matrix (RAM) Project management is a complex process that involves multiple stakeholders, tasks, and resources. To ensure the success of a project, it is crucial to assign clear roles and responsibilities to team members and accurately define their tasks. One tool that can help project managers achieve ...

  6. What Is a Responsibility Assignment Matrix (RAM) in Project Management?

    A Responsibility Assignment Matrix (RAM) is a tool used in project management to define and assign roles, responsibilities, and authority levels for each task or activity within a project. It includes columns for each team member's name, their role or title, their area of expertise or skill set, and any other pertinent information related to ...

  7. The Responsibility Assignment Matrix (RAM)

    Developing a Responsibility Assignment Matrix. One tool that project managers use to keep these assignments clear is the Responsibility Assignment Matrix (also called the RAM, or the Responsibility Matrix). This matches deliverables with the people who are responsible for them. For every piece of the project, the matrix shows who needs to ...

  8. What Is a RACI Chart? Practical Examples & Project Uses

    A RACI chart—also known as a responsibility assignment matrix—is a diagram used in project management to define team roles across 4 categories: Responsible, Accountable, Consulted, and Informed. It helps clarify who does the work, who calls the shots, whose opinion matters, and who needs to stay in the loop for each task, milestone, or ...

  9. What is a RACI Chart? Definition & Example

    A RACI chart, or responsibility assignment matrix, is a project management tool that defines and clarifies roles and responsibilities within a project team. It helps establish clear communication, improve decision-making, and ensure accountability for tasks or deliverables. A RACI chart stands for:

  10. Responsibility Assignment Matrix: Advantages & Examples

    What is a Responsibility Assignment Matrix in Project Management? A Responsibility Assignment Matrix (RAM) in Project Management is a tool that outlines and defines the roles and responsibilities of individuals or groups involved in a project. Its purpose is to ensure that everyone understands their specific duties and tasks.

  11. Responsibility Assignment Matrix: the Basics and Template

    Responsibility Assignment Matrix (RAM): this article explains the Responsibility Assignment Matrix or RAM for short in a practical way. Next to what it is (including an in-depth explanation video), this article also highlights an example, inlcuiding the steps to conduct, to use it during a complex project and downloadable and editable Responsibility Assignment Matrix template to get started.

  12. RACI Charts

    A RACI chart (sometimes called a Responsibility Assignment Matrix) is a way to identify your project teams' roles and responsibilities for any task, milestone, or project deliverable. By following the RACI acronym, you can clarify responsibility and reduce confusion. RACI stands for: Responsible. This person is directly in charge of the work.

  13. What is a Responsibility Assignment Matrix (RAM) in Project Management?

    A responsibility assignment matrix (RAM) in project management is a key document that distinguishes stakeholders' roles and responsibilities. The RACI chart is the most popular example of a RAM that clarifies stakeholders' roles and defines their involvement. RACI stands for Responsible, Accountable, Consulted, and Informed.

  14. Responsibility Assignment Matrix with Excel RACI Template

    A responsibility assignment matrix is a simple tool that makes projects easier to manage by creating less confusion and more accountability. But you've got more than roles and responsibilities to keep straight. TeamGantt makes it easy to build a project plan your whole team can contribute to and collaborate on. Everything happens online, so ...

  15. RACI Chart: Definitions, Uses And Examples For Project Managers

    A RACI chart, also called a RACI matrix, is a type of responsibility assignment matrix (RAM) in project management. In practice, it's a simple spreadsheet or table that lists all stakeholders on ...

  16. Responsibility Assignment Matrix (RACI Matrix) Explained

    A RACI matrix is an essential project management tool used to define roles and responsibilities for a project or project task. It's about defining who's responsible for projects or tasks, and what level of input is expected of them. The acronym 'RACI' stands for: R esponsible. A ccountable.

  17. What is a Responsibility Assignment Matrix

    A Responsibility Assignment Matrix (RAM), sometimes known as a RACI chart, is a tool used in project management to keep track of all responsibilities assigned to cross-functional teams on a specific task or assignment. It's known as a RACI chart because its acronym names the four key roles displayed in the matrix:

  18. Responsibility Assignment Matrix (RAM)

    A Responsibility Assignment Matrix (RAM) describes the participation of various organizations, people, and their roles in completing tasks or deliverables in a Work Break Down Structure (WBS) for a project. A Responsible, Accountable, Consulted, and Informed (RACI) matrix is used on projects where multiple groups of people as assigned a task ...

  19. Responsibility Assignment Matrix: Template, Example & Benefits

    The goal of the Responsibility Assignment Matrix (RAM) is to clearly define roles and responsibilities of everyone on a project team. This ensures that everyone understands their role and how it fits into the bigger picture. RAM also allows for quick identification of whom to contact when an issue arises.

  20. The Responsibility Assignment Matrix

    The responsibility assignment matrix, also known as RAM, is a helpful tool used in project management to identify and clarify the roles and responsibilities of each team member. It ensures that every team member understands their duties and how they fit into the project plan. Using RAM in project management helps define roles and ...

  21. What Is a Responsibility Assignment Matrix (RAM)?

    Introduction to Responsibility Assignment Matrix (RAM) Project management is a complex process that involves multiple stakeholders, tasks, and resources. To ensure the success of a project, it is crucial to assign clear roles and responsibilities to team members and accurately define their tasks. One tool that can help project managers achieve ...

  22. Responsibility Assignment Matrix

    The acronym RAM stands for Responsibility Assignment Matrix. Responsibility Matrix vs. Project Plan. A Responsibility Matrix is different from a Project Plan. The Project Plan is a detailed ...

  23. The Significance of Responsibility Assignment Matrix in ...

    A Responsibility Assignment Matrix (RAM) is a valuable tool for any business, no matter the size. It is a structured way to ensure that every aspect of a project is assigned to the correct person, thus ensuring that each person knows what is expected of them and helps to keep the project on track. To better navigate all this, opt for a reliable ...